Single-Family Residential

Print
Press Enter to show all options, press Tab go to next option

Single-Family Residential Applications and Fees

Below are applications for improvements, new construction (additions), or business operations proposed in Single-Family Residential zoning districts (R-1 and R-1-H). 

All Planning permits require a completed application form with the property owner(s) original signature, a fee payment, and required submittal materials in order to be accepted at the Public Counter. Prior to submitting an application, please consult with a Planner to determine the requirements for your project at the Public Counter, by phone at (818) 238-5250, or by email at planning@burbankca.gov.  

All plans submitted with a Planning Application are expected to meet these Standard Plan Details.

Based on the type of application, a Project Sign may be required to be posted on-site during the review process. Upon determination of application completeness, the Project Planner will provide the sign details for your application.  

APPLICATION TYPE

REQUIRED FEE

 FORMS AND REQUIREMENTS

Accessory Structure Covenant

(Estimated Permit Review Time: Up to 4 months)

 $518 

Accessory Dwelling Unit (ADU)

(Estimated Permit Review Time: Up to 4 months)

$1,915

    Administrative Use Permits (AUP)

   (Estimated Permit Review Time: Up to 6 months)

     Required for all AUPs:
 Large Family Day Care  $1,412
 Home Occupation - Music Lessons  $854

Conditional Use Permit (CUP)

(Estimated Permit Review Time: Up to 8 months)

 $2,736

Fence Exception Permit: Major or Minor

(Estimated Permit Review Time: Up to 6 months)

  • $432 for Minor
  • $387 for Minor in hillside area
  • $1,730 for Major

Floor Area Ratio (FAR) Exception

(Estimated Permit Review Time: Up to 12 months)

$639

Hillside Development Permit

(Estimated Permit Review Time: Up to 12 months)

$1,111 
Historic Preservation Mills Act $0 

Minor Setback Exception

(Estimated Permit Review Time: Up to 4 months)

$249 

Single Family Special Development Permit

(Estimated Permit Review Time: Up to 12 months)

 $656

Variance

(Estimated Permit Review Time: Up to 8 months)

 $2,523
 Appeal a Permit Varies 
  • For more information on submitting an appeal, visit the Appeals page.

 

View Full Site