Burbank News

Breadcrumb

Burbank Receives $17.5 Million Grant to Improve BurbankBus and Downtown Metrolink Station

Burbank, CA (November 19, 2026) – The City of Burbank’s Community Development Department, through its Transportation Division, has been awarded a $17.5 million grant from the California State Transportation Agency’s (CalSTA) Transit and Intercity Rail Capital Program (TIRCP) Cycle 8. The grant award will help fund a service optimization project for the BurbankBus Orange Route, make transit station improvements at the Downtown Burbank Metrolink Station, and provide more comfortable pedestrian and bicycle connections to transit stops. 

“This funding provides a transformative investment in mobility for Burbank,” said Mayor Tamala Takahashi. “Whether people live, work, or visit here, they deserve more options to get around. This project represents a shared commitment to reducing our greenhouse gas emissions while also enhancing Burbank’s quality of life.”

Burbank’s $17.5 million grant-funded initiatives will include the following components:

  • BurbankBus Service Optimization.

The BurbankBus Orange Route will be streamlined to operate in both directions, extend service to the Empire Center, Downtown Burbank Metrolink Station, and the new Hollywood-Burbank Airport replacement terminal. Funded improvements will include new transit shelters, ADA-accessible sidewalk and crossing upgrades, and real-time arrival displays at all stops. These project elements implement community-driven recommendations from the City’s transit stop amenities survey, and the BurbankBus Comprehensive Operations Analysis, completed in 2026. 

  • Downtown Burbank Metrolink Station Rider Improvements and First-Last Mile Connectivity. 

The Downtown Burbank Metrolink Station serves Metrolink and Amtrak rail passengers while also functioning as a key transfer point to transit and mobility services including BurbankBus and Metro buses. The project will renovate the Metrolink station and surrounding area to improve accessibility, passenger comfort, and connections to other transit services. Work will include repaving and redesigning the parking lot to accommodate more multimodal connections, adding shade trees and lighting, improving station signage and wayfinding, upgrading building systems and restrooms, and installing platform amenities such as benches and shade structures. The project will also improve first- and last-mile connections by directly connecting the Burbank Channel and Chandler Bikeways, and will reconstruct the Front Street Cycle Track as a protected sidewalk-level facility.  The project will also make pedestrian lighting, crosswalks, and curb extensions in Downtown Burbank connecting to the station.

“The residents and businesses who choose Burbank believe in a vision of a safe, beautiful, and thriving community with excellent transit options,” said Community Development Director Patrick Prescott. “City staff work hard every day to support that vision. With this funding, we will continue to modernize our transportation infrastructure and make it more comfortable to travel in Burbank.”’

Questions regarding this statement should be directed to Transportation Division at (818) 238-5290 or [email protected]. 

###

Published on: November 19, 2026
09:10 AM