Search Results

Showing results for "SB 9 Urban Lot Split Eligibility Application"

No results were found that matched the keywords: SB 9 Urban Lot Split Eligibility Application.
Search Results

2023 OIR Responses

The review covered areas such as internal investigations, applications of use of...Recommendation 9: BPD should carefully evaluate the use of...

Last Modified: 08/19/2025

1719 RUDELL RD_HDP_10.7.25 PROJECT PLANS

WALL INTERIOR/EXTERIOR LOT BDRY.LINE FLOWLINE EXIST....the Development Planning for storm Water Management-A manual for the Standard ...

Last Modified: 12/08/2025

UpperLARiver_Draft_Appendix7.pdf

As demonstrated below, this final WLA is still applicable to Segment B....private food-based manufacturing facility borders the site to the west, and a parking...

Last Modified: 03/25/2021

Gabreleno Band of Mission Indians - Kizh Nation signed Tribal Enforceable Agreement 2024

Band of Mission Indians - Kizh Nation and the City of Burbank for the Proposed SB...Gabrieleno Band of Mission Indians - Kizh Nation (the Kizh) regarding the proposed...

Last Modified: 05/15/2024

Appendix C_AQ_Energy_GHG Data.pdf

Construction Vehicle Control Strategies Non-applicable....Construction Earthmoving Control Strategies Non-applicable....Construction Vehicle...

Last Modified: 12/13/2024

4. Community Development Goals Committee_Redacted.pdf

scope of the design was to provide a multi-story facility on an extremely small lot...Commission (Chair) - Founder of the original Buy Nothing Group that eventually...

Last Modified: 06/16/2022

Project Plans 567 Santa Anita

OF NE 95 FT OF SE 152.5 FT OF NW 320 FT OF LOT 2 BLOCK: 29 ZONE : R4 LOT AREA:...MAX LOT COVERAGE: 70% = 5,016.2 SF OPEN...

Last Modified: 09/29/2026

SR - Proposed Public Tree Ordinance FINAL.pdf

If so, the applicant is directed to first obtain approval from the Landscape and...Urban Forestry Division for the removal of the tree....by...

Last Modified: 02/02/2023

2026.07.09 Pet. Metro's DeFrenza Declaration ISO Reply to Motion for Prelim. Injunction

utility tunnels, alleys, storm drains, sanitary sewers, survey monuments, parking lots...All landscaping changes shall be coordinated with the City's ...

Last Modified: 07/20/2026

ADU DIF Calculation

ADU SF PRIMARY RESIDENCE SF PERCENTAGE / * Per SB 543 any ADU submitted after January...SqFt/Unit PERCENTAGE / For the purpose of calculating the fees for an ADU on a...

Last Modified: 05/28/2026

Updated_Project_Plans.pdf

GROSS LOT AREA AFTER DEDICATION: ± 38,361.13 SQ.FT ALLOWABLE LOT COVERAGE: 80 %...=> 12’-9” + 5’-0” =...

Last Modified: 10/29/2024

20210101_1258_E_Elmwood_Decision.pdf

All projects shall comply with Title 9, Chapter 1, of the Burbank Municipal Code,...Page 9 of 11 • Nonstructural or non-seismic alterations or...

Last Modified: 04/13/2021

Waste Reduction Regulations Ordinance

Last Modified: 04/27/2026

Hap Minor Baseball Rules 2025.pdf

PLAYERS ELIGIBILITY A....Only members of the Sports Office staff may receive applications or waivers for...The second and third game if...

Last Modified: 04/28/2025

Pet. Metro's DeFrenza Declaration ISO Reply to Motion for Prelim. Injunction

utility tunnels, alleys, storm drains, sanitary sewers, survey monuments, parking lots...All landscaping changes shall be coordinated with the City's ...

Last Modified: 07/20/2026

STANDARD PLAN FORMATTING 2022 (2).pdf

If the project is on a corner lot, photographs should include both streets....standards such as lot coverage and Floor-Area Ratio (FAR)...SITE...

Last Modified: 05/18/2022

2025 Thousand Oaks AA

Last Modified: 07/28/2025

Toaa2025

Last Modified: 07/28/2025

20210101_2805_N_Myers_PN.pdf

The final proposed floor area on the lot is 2,412 square feet....The final proposed floor area on the lot is 2,412 square feet....have dark parcel...

Last Modified: 04/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet