Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"
BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...
Last Modified: 02/05/2021
Additional impacts to street triggered by this project could extend the paving...All off-street parking areas and accessways shall be graded,...
Last Modified: 10/27/2022
Last Modified: 03/23/2026
2023 8 122 0 122 0 Building Construction 2024 1/1/2024 12/31/2024 8 366 0 273 93 Paving...05 0 Building Construction 2024 0 0.11167949 0.0059963 0 0.00012285 6.59589E-06...
Last Modified: 07/09/2021
LANDSCAPE DETAILS AND SPECIFICATIONS PROPOSED COVERED PATIO PERMEABLE STONE PAVING...BELLOW THE STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 4" ABOVE EARTH OR 2" ABOVE...
Last Modified: 05/18/2021
All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...
Last Modified: 06/26/2023
Enhanced stamped paving at main project entry....Small open space area with seating area with raised planters & enhanced paving on...22 1618 15 4...
Last Modified: 05/14/2024
(CRC R401.3 exception, CBC 1804.4) Grading and Paving: Plans shall indicate how...(CRC R106.2, CBC 107.2.6) All existing and new driveways, driveway curb cuts,...
Last Modified: 09/08/2026
Last Modified: 05/02/2023
Last Modified: 06/29/2023
Experiencing a problem? Use one of our City Services to help solve it!
Last Modified: 10/01/2026
The entire project site is paved with ornamental landscaping along the perimeter...The entirety of the project site is paved except for...
Last Modified: 04/12/2021
32,794 23008 Downtown Ped Improvements CD 117,206 117,206 24184 FY 21-22 Annual Res Paving
Last Modified: 05/13/2021
ALL LANDSCAPED AND PAVED AREAS SHALL BE MAINTAINED IN A NEAT AND ORDERLY CONDITION
Last Modified: 05/19/2021
Blvd Reconfig (Phase 1) CD 187,000 358,000 545,000 24184 FY 21-22 Annual Res Paving
Last Modified: 05/12/2022
GRADED BASIN OR PAVING (BY OTHERS). 7.
Last Modified: 07/11/2023
applicant will have to restore the street fronting the property per City of Burbank paving
Last Modified: 07/20/2021
Blocks towards the Media District typically have fully paved 15 foot wide sidewalks...These include paved areas, buildings, bridges, and other...
Last Modified: 06/26/2026
As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...
Last Modified: 11/29/2021
Showing 241 to 260 of 500 entries.