Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta.
Search Results

Attachment B - Project Plans.pdf 1

Enhanced stamped paving at main project entry.

Last Modified: 06/26/2023

1719 San Fernando Rd - Plans

SEE SHEET A-1.1 FOR SITE DETAILS 37 29 38 PARKING LOT TOTAL PAVED AREA 50% SITE

Last Modified: 09/09/2022

Attachment 4 Project Plans and Subdivision Map...pdf

Enhanced paving at main project entry....Integral colored concrete paving at open space gathering. 4' wide community natural

Last Modified: 10/20/2022

Apx A - 1995 Adopted EIR

The areas to the west and south of the buildings shall be paved with concrete and...The areas to the west and south of the buildings shall be...

Last Modified: 10/20/2026

The Burbank2035 General Plan

sidewalks of adequate  width, benches, street trees and landscaping, decorative paving...Bikeway:  These  are  commonly  called  bike  paths  and  provide  a  separate, ...

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

sidewalks of adequate  width, benches, street trees and landscaping, decorative paving...Bikeway:  These  are  commonly  called  bike  paths  and  provide  a  separate, ...

Last Modified: 11/17/2021

20260421-GeneralPlan-001.pdf

coatings, residential fuel combustion, construction and demolition, dust from paved...sidewalks of adequate width, benches, street trees and landscaping, decorative...

Last Modified: 04/21/2026

Burbank2035_Updated (002)

coatings, residential fuel combustion, construction and demolition, dust from paved...sidewalks of adequate width, benches, street trees and landscaping, decorative...

Last Modified: 03/24/2026

3000 Haven Way, Burbank, CA 91504 - ARCH SET - UPDATED SET 1.9.25

ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT...walls. the screed shall be placed a minimum of 4 " above the earth or 2" above...

Last Modified: 01/28/2026

3518 Haven way - Project Plans

FOR ALL PROPOSED PAVED AREAS, ALL OLD FILL AND THE UPPER 1 TO 2 FEET

Last Modified: 08/03/2026

ThePickwick_CompletePlanSet_2022-02-04.pdf

Enhanced paving at main project entry....Integral colored concrete paving at open space gathering. 4' wide community natural...Exhibit 80' Scale: ...

Last Modified: 03/01/2022

2022 Comm-Mixed Correction List

screed shall be place not less than 4 inches above the earth or 2 inches above paved...with exceptions, notes and table) 5.106.8 through 5.106.8.2 Mandatory Grading and...

Last Modified: 02/09/2026

20210622_2814_Empire_Ave_City_Response.pdf

◼ Additional impacts to street triggered by this project could extend the paving

Last Modified: 08/27/2021

20130213_Plan Realization.pdf

 Use alternative paving materials, such as rubberized asphalt, to reduce traffic

Last Modified: 11/17/2021

3201 W Olive Ave Proposed Plans.pdf

IN CASE OF CONFLICT OF INDICATED PAVING OR SLAB SLOPES WITH CIVIL DRAWINGS, THE CIVIL...NOT IN CONTRACT CONCRETE PAVING PERVIOUS...

Last Modified: 07/26/2022

Burbank Aleppo Pine Tree Removal MND

Construction Paving 5.8....Construction Paving Land Use Area Paved (acres) % Asphalt City Park 0.00 0% ...

Last Modified: 05/31/2024

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

ALL EXISTING AND NEW DRIVEWAYS, DRIVEWAY CURB CUTS, PAVED FRONT YARD AREAS AND FRONT...walls. the screed shall be placed a minimum of 4 " above the earth or 2" above...

Last Modified: 03/11/2026

2021_Planning_Burbank2035 EIR Appendix F, Part 1.pdf

streets include a developed pedestrian network, interconnected by a variety of paved...streets include a developed pedestrian network, interconnected by a variety of...

Last Modified: 07/29/2021

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

Additional impacts to street triggered by this project could extend the paving...Enhanced stamped paving at main project entry....19. 12 4 10 1 6 ...

Last Modified: 12/26/2023

20210113-la-river-bridge-rfp-001.pdf

existing facilities, utility relocation and undergrounding, earthwork - grading, paving

Last Modified: 01/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet