Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Custom Wall Panel Bergaransi Wonogiri.
Search Results

GGRP Update Final_w.App

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 11/13/2025

GGRP Update Final_w.App.pdf

Key Target Metrics: Reduce annual customer energy use by a collective 63 GWh by...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 10/23/2022

3915 Heffron Drive - Revised Plans - 6.30.26

PROVIDE ALL NECESSARY CEILING OR WALL ACCESS PANELS AS REQUIRED FOR AIR CONDITIONING...IN FIRE RATED ASSEMBLIES PROVIDE RATED ACCESS...

Last Modified: 09/04/2026

02192013_Burbank_Greenhouse_Gas_Reduction_Plan.pdf

windows and doors, attic insulation, central air conditioners, solar attic fans, wall...Intergovernmental Panel on Climate Change. 2000....See...

Burbank GGRP CEQA_3.9.2022_CLEAN.pdf

Action W-1.1.c Continue enforcement of large irrigation customers required to...75 and the noise source reduces the noise level by about 5 dBA, while a solid...

Last Modified: 03/09/2022

Attachment 1 – City Council Resolution

ATTACHMENT 1 – PAGE 6 Wireless customers to an area that currently has none....of a new unmanned roof-mounted wireless telecommunication facility with three...

Last Modified: 10/18/2024

Rob Searcy - LALAX04397B AUP Application.pdf

adequate in size and shape to accommodate the use and are all of the yards, setbacks, walls...locatedRow2: wireless access to voice, data and E911 services for residents,...

Last Modified: 04/26/2024

20210701_921_Riverside_Dr_City_Response_Final.pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/27/2021

20210701_921_Riverside_Dr_City_Response_Final (1).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (2).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

20210701_921_Riverside_Dr_City_Response_Final (3).pdf

Location of the existing electric service panel b....Proposed location of the electric service panel/meters. f....the actual cost of: a)...

Last Modified: 08/30/2021

2025 OCT FINALED

10/01/2025Permit Final Final Date:Permit Status: DEFERRED SUBMITTAL-PERFORATED PANEL...No structural, all walls to be non-bearing....Permit...

Last Modified: 11/03/2025

Final Submission - 4.10.25

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 07/15/2025

Final Submission

UNIT DOOR SIZE GLAZE DUAL TEMP 24'-0" 1 3/4"1 WIDTH HEIGHT THK 2 EXTERIOR PANEL...DOORPAINTED1 3/4"2'-8"1 3 2'-8"2 PAINTED8'-0" 8'-0" 8'-0" 1 3/8" 6...

Last Modified: 06/16/2025

20220901-FY-2022-23-Adopted-CIP

2,079,750 H-24 Day Ahead Planning and Resource Center 80,000 80,000 H-25 DC Panel...City of Burbank Project Information Sheet FY2022-23 BWP-Electric Utility DC...

Last Modified: 09/01/2022

3001 SB35 - Plans.pdf

1110 S.FSOLAR PANEL 1110 S.F 13 24 44 5'-5" 261'-4" 5'-8" 3 8' -5 " 6 2 '-...Solid Joint at trap-no access panel required....Solid Joint at...

Last Modified: 06/26/2023

2024-01-16_Thornton Planning Package

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

ROOF WIL BE A PANELIZED SYSTEM WITH MEMBRANE ROOFING....EAST EXTERIOR WALL HR. SOUTH EXTERIOR WALL HR....ANCHOR BOLTS...

Last Modified: 01/13/2025

20210301_AvionPlansPart1_Avion.pdf

MTL-7 FLAT METAL PANEL MTL-8 LAP SEAM METAL PANEL PAINTED BLUE MTL-9 STEEL BEAM...CALCULATION VC-1.0 VECHICULAR,PEDESTRIAN/BICYCLE CIRCULATION...

Last Modified: 03/31/2021

2025 CALGreen Nonresidential Mandatory Measures

Water closets shall not exceed 1.28 gallons per flush (gpf) 5.303.3.1 Mandatory Wall-mounted...Mandatory Verification of compliance 5.504.4.7.1 Mandatory Acoustical...

Last Modified: 02/09/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet