Search Results

Showing results for "dWA 0812 2782 5310 [[Pandawa]] Kontraktor Neon Hotel Cafe Wilayah Simo Boyolali"

No results were found that matched the keywords: dWA 0812 2782 5310 [[Pandawa]] Kontraktor Neon Hotel Cafe Wilayah Simo Boyolali.
Search Results

ApxC2_PhaseIArchaeologicalResourcesReport.pdf

on the Southern Pacific Railroad line, also had a streetcar line, a sixty-room hotel

Last Modified: 07/09/2021

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

FOR NONRESIDENTIAL, HIGH-RISE RESIDENTIAL, AND HOTEL/MOTEL BUILDINGS, SPACE CONDITIONING

Last Modified: 04/12/2024

1. Burbank Water and Power Board_Redacted

Managed national and local SEM campaigns for 3,700 locations and 10 brands of Hilton Hotels

Last Modified: 06/13/2024

11/16/21 - PH - Attachment 9

shopping and office center, Media Studios North office campus, Airport Marriott hotel

Last Modified: 11/04/2021

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

20201210.FY20_21FeeScheduleADOPTED.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

20201210.FY19_20FeeScheduleADOPTED.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 03/09/2023

20211026-FY-2021-22-ADOPTED-BUDGET

Hotel occupancy rates declined significantly in FY 2020-21, impacted by the State...The hotel industry may likely experience a boom from the...

Last Modified: 10/26/2021

20230504-FY-2023-24-Proposed-Budget-Final.pdf

Although not fully recovered to pre-pandemic levels, hotel occupancy rates for March...The average daily rate for a hotel in Burbank increased by...

Last Modified: 05/04/2023

20260601-2026.05.20 Summons & Complaint reduced-001.pdf

but does not include a project of which any portion is designated for use as a hotel...preempt or otherwi se di splace local di scretionary standards that apply to ...

Last Modified: 06/01/2026

9212 Report.pdf

• Transient and tourist hotel occupancy as defined by Civil Code Section 1940(

Last Modified: 03/04/2021

The Colony Theatre Proposal_City of Burbank RFP 2023.pdf

At the Hilton Hotels Corporation and Hilton Garden Inn she supported the Senior

Last Modified: 09/20/2023

719 Wilson Ct_HDP_Revised Plans 121423

For Nonresidential, high-rise residential, and hotel/motel buildings, space conditioning

Last Modified: 01/31/2024

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way 1,014,890 sf industrial park, 166 room hotel, 142,250 sf office,...Aloft Hotels & Residence Inn 2500 N....14 495 33 106 343 56 2838...

Last Modified: 09/10/2021

2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way 1,014,890 sf industrial park, 166 room hotel, 142,250 sf office,...Aloft Hotels & Residence Inn 2500 N....14 495 33 106 343 56 2838...

Last Modified: 09/10/2021

2021_Planning_2311NHollywoodWay_SCEA_ResponsetoComments_2021-09-10.pdf

Hollywood Way 1,014,890 sf industrial park, 166 room hotel, 142,250 sf office,...Aloft Hotels & Residence Inn 2500 N....14 495 33 106 343 56 2838...

Last Modified: 09/14/2021

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Manufacturing 1000 SF 4.4096 $3,588 28 Chemicals & Allied Product Mfg (b) 0.0000 $993 70 Hotel...1000 SF 7.4065 $6,027 20 Food Product Mfg (Industrial) 1000 SF 1.9207...

Last Modified: 06/20/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet