Showing results for "dWA 0812 2782 5310 Ahli Pemasangan Kitchen Set Hollow Besi Modern Serengan Surakarta"
Any unit not developed with individual kitchens and bathrooms must have access to...common areas containing kitchen and bathroom...
Last Modified: 10/21/2022
Any unit not developed with individual kitchens and bathrooms must have access...to common areas containing kitchen and bathroom...
Last Modified: 06/29/2023
Last Modified: 09/16/2022
THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...A PERMANENT MONUMENT SHALL BE RESET, OR A WITNESS MONUMENT OR MONUMENTS...
Last Modified: 06/15/2023
REQ'D SETBACK FOR PROPERTY: 35.5' PROPOSED SET BACK : 35'-10" >35'-6" OK (N...-KITCHEN FAN TO BE 100 CFM ,3 SONE MAX...."X 70 " (E ) W IN...
Last Modified: 04/13/2021
INSTALL NEW TORCHDOWN, PLYWOOD AS NEEDED, ICC ESR-2018 CRRC 0616-0011A Modern Roofing...VENT FANS, & (1) KITCHEN HOOD....LABELED AND CERTIFIED...
Last Modified: 07/07/2025
SCOPE OF WORK - (N) 6' TALL FRONT GATE SET BACK 28'. - (N) RETAINING WALL FOR POOL...58 SF HALLWAY 280 SF LIVING ROOM (E) FIREPLACE TO BE DEMOLISHED 155 SF ...
Last Modified: 04/05/2022
REPLACE (23) ELECTRICAL OUTLETS, (5) ELECTRICAL FIXTURES, (1) KITCHEN HOOD, (1)...Interior remodel of dwelling (great room, laundry, kitchen,...
Last Modified: 03/03/2026
Thornton 1 1 Low RDA Set-Aside Perpetuity 2331 N....The new facility includes private family bedrooms, a commercial kitchen,...
Last Modified: 04/15/2021
issues and opportunities facing the community, setting strategic direction and...Council goal setting also provides a clear message to City...
Last Modified: 12/10/2020
Permit Type: BS2508065 2526 N 10/06/2025 NAOMI ST Sign $5,000.00Valuation: One Set...148 S 10/31/2025 VICTORY BLVD Sign $8,670.00Valuation: 2 signs - Install two...
Last Modified: 11/03/2025
issues and opportunities facing the community, setting strategic direction, and...Council goal setting also provides a clear message to City...
Interests in utility grid modernization, transportation electrification (electric...and vitality, and address hard-to-reach and disadvantaged communities. • Led EE...
Last Modified: 06/13/2024
& BATHROOM, REMOVE A NON-LOAD BEARING WALL IN KITCHEN, REPLACE WATER HEATER AND...TO INCLUDE: (1) KITCHEN HOOD, (12) ELECTRICAL OUTLETS, (7)...
Last Modified: 05/01/2025
to a rooftop terrace, business center/internet café, coffee bar, demonstration kitchen...Development with modern materials and in accordance with...
Last Modified: 05/04/2021
INTERIOR REMODEL; LIVING ROOM, BATHROOM, KITCHEN, LAUNDRY, CONVERT FAMILY ROOM INTO...REMODEL KITCHEN; 2. REMOVE KITCHEN...
Last Modified: 04/04/2025
the project site with an architecturally distinctive design that is clean and modern...designed to incorporate aspects of the aviation history of the project site with a...
Last Modified: 03/31/2021
Last Modified: 03/25/2026
This modernized system will: Improve layout, readability, and navigation Provide
Last Modified: 08/13/2025
Showing 301 to 320 of 2,567 entries.