Showing results for "dWA 0812 2782 5310 Biaya Borongan Pasang Interior Rumah 2 Lantai Warna Putih Sedayu Bantul"
3400 11/10/2025 RIVERSIDE DR Mechanical $950,000.00Valuation: MECHANICAL - INTERIOR...CONSTRUCTION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS,...
Last Modified: 12/01/2025
The computation excludes the columns, permanent interior walls, stair shafts, mechanical...The computation includes corridors, bathrooms,...
Last Modified: 05/26/2022
Last Modified: 04/23/2026
VICTORY PROPERTIES LLC 2817 W VICTORY BLVD, Burbank CA 91505 661-910-3521 Page 2...CA 91502 818-275-0626 [email protected] Entertainment/Related Services ...
Last Modified: 02/04/2025
existing from the subject driveway or going in either direction on Amherst Dr. 2....with a grey stucco finish, with the front fence having an open design on the top...
Last Modified: 08/04/2022
with a grey stucco finish, with the front fence having an open design on the top 2...The proposed fences are limited to the front yard and side yard portion of the...
(3) “Living area” means the interior habitable area of a dwelling unit, including...(3) “Living area” means the interior habitable area of a...
Last Modified: 03/30/2021
(3) “Living area” means the interior habitable area of a dwelling unit, including...(4) “Living area” means the interior habitable area of a...
However, these alterations were done consistent with the Secretary of the Interior...Only the exterior of the house is proposed for designation; the ...
Last Modified: 01/29/2026
2808 W 04/07/2025 BURBANK BLVD Electrical $2,000.00Valuation: ELECTRICAL FOR Interior...Interior Remodel. New attached 363 SF Covered Patio &...
Last Modified: 05/01/2025
Sunday and City Holidays 8:00 a.m. to 5:00 p.m. for interior work only. 2....Power-driven fasteners shall not be used to anchor sill plates ...
Last Modified: 11/24/2025
Scheduled on Northbound Interstate 5 in Burbank for Repaving Project: Feb. 27-March 2...Monday, March 2, crews will reduce northbound I-5 to two...
Last Modified: 02/24/2026
Scheduled on Northbound Interstate 5 in Burbank for Repaving Project: Jan. 30-Feb. 2...Monday, February 2, crews will reduce northbound I-5 to two...
include securing funding to revitalize the existing vehicle, retrofitting the interior
Last Modified: 09/14/2022
the immediate area must halt and an archaeologist meeting the Secretary of the Interior...adjacent mainland coast and cremation on the remainder of the coast and in the...
Last Modified: 04/12/2021
Imp PW 240,000 1,000,000 1,120,000 2,360,000 21718 Providencia Relief Sewer - 2...Replacement PS 80,000 80,000 80,000 80,000 80,000 80,000 80,000 560,000 23371...
Last Modified: 05/12/2022
at the Project Site, future residential building must be designed to meet an interior...Compliance with this requirement would ensure that...
Last Modified: 01/07/2025
Showing 721 to 740 of 6,153 entries.