Search Results

Showing results for "dWA 0812 2782 5310 Biaya Kontraktor Interior Ruang Jemur Pakaian Murah Depok Sleman"

No results were found that matched the keywords: dWA 0812 2782 5310 Biaya Kontraktor Interior Ruang Jemur Pakaian Murah Depok Sleman.
Search Results

2025 ADMIN PLAN - REDLINE DRAFT RAB WATERMARK (2).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/11/2025

2025 ADMIN PLAN - REDLINE DRAFT RAB WATERMARK.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/11/2025

2025 ADMIN PLAN - REDLINE DRAFT RAB WATERMARK (1).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/11/2025

2025 ADMIN PLAN - REDLINE DRAFT RAB WATERMARK (3).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/11/2025

Attachment 3 – Proposed 2025 Amended Administrative Plan (Redline)

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/27/2025

2025 ADMIN PLAN - REDLINE 03.10.25.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/11/2025

2025 ADMIN PLAN - REDLINE 03.10.25 (1).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/11/2025

AMENDED BHA ADMIN PLAN 2025.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 04/10/2025

BHA Administrative Plan Draft- 2026.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 02/10/2026

AMENDED BHA ADMIN PLAN 2026.pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 04/09/2026

Att2 - Proposed 2026 Amended Administrative Plan

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/26/2026

FY 2021-22 Proposed Budget.pdf

requested to support the purchase of a specially designed vehicle with a modified interior...2 Openings Exterior Doors, Apparatus Doors, Windows and Gates $ 150,000 3...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

requested to support the purchase of a specially designed vehicle with a modified interior...2 Openings Exterior Doors, Apparatus Doors, Windows and Gates $ 150,000 3...

Last Modified: 04/22/2021

Appendix A - Air Quality Technical Report.pdf

Area (sf) Interior (sf) Exterior (sf) Residential Apartments Mid-Rise 60,904 123,330.60...Architectural Coatings Phase Name Residential Interior...

Last Modified: 01/07/2025

Attachment 1 - BHA Resolution (1).pdf

DROP BOX The BHA has installed an interior drop-box for all paperwork to be submitted...The interior drop-box will be available during normal...

Last Modified: 03/28/2024

ApxG1_Phase I ESA - Part 1.pdf

Two pad- mounted transformers, and three dry interior transformers were observed...Additionally, no other potential PCB-containing equipment...

Last Modified: 07/09/2021

FY 2025-26 Proposed Budget

370.PR21A.70003.0000.25126 Expenditure Plan Project Description Renovate the interior...370.PR21A.70003.0000.25127 Expenditure Plan Project Description Renovate the...

Last Modified: 05/01/2025

20240502-FY-2024-25-Proposed-Budget-COMPLETE

new building components, all aspects of facility-related infrastructure such as; Interior...As the City’s first “green” building with LEED Gold certification, the...

Last Modified: 05/02/2024

20230504-FY-2023-24-Proposed-Budget-Final.pdf

new building components, all aspects of facility-related infrastructure such as interior...includes repairing and replacing cabinets, counters, appliances, lighting,...

Last Modified: 05/04/2023

20220421-FY-2022-23-Proposed-Annual-Budget-Final.pdf

FC 2 Openings $ 150,000 $ 150,000 $ 150,000 450,000 Bldg FC 3 Interior...building components, all aspects of facility-related infrastructure such as the...

Last Modified: 04/21/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet