Showing results for "dWA 0812 2782 5310 Biaya Kontraktor Interior Ruang Jemur Pakaian Murah Depok Sleman"
INTERIOR FINISHES: - INTERIOR FINISH MATERIALS APPLIED TO WALL AND CEILINGS SHALL...(TYPICAL) - ALL INTERIOR WALLS IN THE...
Last Modified: 06/17/2024
1521 East Alameda Avenue, for two (2) retaining walls higher than 4 ft along the interior...Fence Exception Permit for two (2) retaining walls higher than 4 ft along the...
Last Modified: 10/16/2025
Quality Act (CEQA) under CEQA Guidelines Section 15301(a) pertaining to minor interior...Quality Act (CEQA) under CEQA Guidelines Section 15301(a) pertaining to minor...
Last Modified: 02/28/2024
A RESOLUTION OF THE COUNCIL OF THE CITY OF BURBANK TO DESIGNATE THE HOUSE, INTERIOR...Ford Street, to designate the exterior, the garage exterior, and portions of the...
Last Modified: 08/28/2025
Demolition of interior walls, as long as exterior walls are maintained, does not...Applicant shall calculate the linear length of all exterior and...
Last Modified: 01/27/2022
CONSTRUCTION OF NEW INTERIOR NON-LOAD BEARING PARTITIONS, MILLWORK, FIXTURES, &...Scope of work to include new interior remodel with new...
Last Modified: 06/05/2025
the reconstruction of a portion of the existing retaining wall located in the interior...the reconstruction of a portion of the existing retaining wall located in the...
Last Modified: 03/02/2022
INTERIOR WALL; 3. INTERIOR PLASTER FINISH ; D * 1 2 3 1....STUD WALL (N) INTERIOR WALL (NON BERING) 2. 2x4"...
Last Modified: 07/29/2022
Complete interior floor plan of all structures, with each room labeled and dimensioned...Include dimensions and square-footage for the interior...
Last Modified: 03/29/2021
Last Modified: 01/26/2022
E4.0 ELECTRICAL ROOF PLAN E5.0 ELECTRICAL SINGLE LINE DIAGRAM E6.0A ELECTRICAL INTERIOR...INTERIOR REMOVAL SCOPE TO INCLUDE REMOVAL OF TWO...
Last Modified: 03/25/2026
CONSTRUCT NEW NON-LOAD BEARING INTERIOR PARTITIONS, MILLWORK, FINISHES, & FIXTURES...Commercial Tenant Improvement 06/09/2025Permit Final Final Date:Permit Status: ...
Last Modified: 07/01/2025
The Project will include minor interior alterations to include partition walls to...The Project will include minor interior alterations to...
Last Modified: 03/19/2024
R-13 BATT INSULATION INTERIOR FINISH 2X WOOD STUD @ 16" O.C....INTERIOR FINISH REFER SCHEDULE PAINTED GYP....WINDOW FRAME ...
Last Modified: 01/31/2024
Last Modified: 02/15/2024
Applicant shall calculate the linear length of all exterior and interior walls....The Director also may reduce the interior side setback adjacent...
Last Modified: 02/08/2022
The Project includes interior remodeling work to add a second restroom....The Project includes interior remodeling work to add a second restroom.
Last Modified: 05/10/2023
Showing 61 to 80 of 720 entries.