Search Results

Showing results for "dWA 0812 2782 5310 Biaya Pembuatan Kitchen Set Dibawah 5 Juta Premium Baki Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Biaya Pembuatan Kitchen Set Dibawah 5 Juta Premium Baki Sukoharjo.
Search Results

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

CONTROL : THE FOLLOWING FINISH MATERIALS SHALL COMPLY WITH THE VOC CONTENT LIMITS SET...- 6" PER MANUF.5' - 4" WOOD FRAMED...

Last Modified: 02/16/2024

Att13 - Draft Environmental Impact Report

economic revitalization and urbanization of the Hollywood Burbank Airport area with premium...economic revitalization and urbanization of the Hollywood Burbank Airport...

Last Modified: 11/05/2026

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

economic revitalization and urbanization of the Hollywood Burbank Airport area with premium...economic revitalization and urbanization of the Hollywood Burbank Airport...

Last Modified: 12/13/2024

Att2a - Resolution - Sequencing of Elections

. _____ A RESOLUTION OF THE COUNCIL OF THE CITY OF BURBANK SETTING THE SEQUENCE...Council considered the criteria set forth in Elections Code...

Last Modified: 06/18/2026

521 Amherst Dr - Decision Letter.docx

This permit is granted per the plan set on file with the Planning Division dated...reproduced on the construction document drawings as part of the Approved Construction...

Last Modified: 08/04/2022

521 Amherst Dr - Decision Letter.pdf

This permit is granted per the plan set on file with the Planning Division dated...reproduced on the construction document drawings as part of the Approved Construction...

Last Modified: 08/04/2022

2025 DEC ISSUED

INFILL (E) WINDOWS IN BEDROOM & KITCHEN. 4. INFILL(E) DOOR AT ENTRANCE. 5....PV modules (2.25KW) with 5 micro-inverters...

Last Modified: 01/02/2026

20201221-AUP-report-Investment-Policy-FY-June-30-2020.pdf

Investments at June 30, 2020 were allowable per the City’s 2020 Investment Policy. 5....Finding: Investment percentages at June 30, 2020 were within the limits...

Last Modified: 12/21/2020

20201221-AUP-report-Investment-Policy-FY-June-30-2018.pdf

Investments at June 30, 2018 were allowable per the City’s 2018 Investment Policy. 5....Finding: Investment percentages at June 30, 2018 were within the limits...

Last Modified: 12/21/2020

3313 Wedgewood Ln - Decision Letter - Signed.pdf

The project shall conform to the approved plan set on file with the Planning Division...demolition and new construction are required to provide a full MWELO plan check...

Last Modified: 08/24/2023

11/16/21 - PH - Attachment 7

(5)  Existing law specifies that the density bonus, or the amount of the density...Attachment 7-5 and the number of for-sale units that satisfy...

Last Modified: 11/04/2021

920 E Grinnell Dr - Project Plans - 12-16-22.pdf

KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, KITCHEN SINKS, LAVATORIES, BATHTUBS...KITCHEN FAUCET 1.8 GPM @ 60 PSI ...

Last Modified: 02/09/2023

DB_Staff_Report_Attachments.pdf

BACKGROUND In 2017, the Council set the goal to build 12,000 dwelling units during...The total increase in density is set on a sliding scale,...

Last Modified: 05/22/2025

BMC_-_Drones

BMC 5-3-1602.A and 5-3-1602.B make it unlawful to operate a UAS in a manner which...within the airspace above or within 50 feet of a film studio ...

Last Modified: 10/16/2025

2026.06.22 City of Burbank Answer to Verified Petition for Writ of Mandate

COMPLAINT REQUEST FOR JURY TRIAL Action Filed: May 19, 2026 Trial Date: Not Set...These changes satisfy the conditions set forth in Public...

Last Modified: 06/26/2026

20230504-FY-2023-24-Proposed-Budget-Final.pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....The kitchen requires commercial-level quality and equipment to...

Last Modified: 05/04/2023

Aboveground Storage Tank Permit Policy

At least three sets of plans, the permit application, and any supporting information...The tank must be readily accessible by fire apparatus. ...

Last Modified: 10/08/2025

2607 W Magnolia Blvd - Approved Project Plans - STAMPED

CAULK BACK OF WINDOW FRAMES BEFORE SETTING....MINIMUM THICKNESS RESILIENT BACKING MAY BE SUBSTITUTED FOR CARPET AND PADDING IN KITCHEN...SOUND...

Last Modified: 02/15/2024

2613 W Magnolia Blvd - Project Plans - 1-15-24

CAULK BACK OF WINDOW FRAMES BEFORE SETTING....MINIMUM THICKNESS RESILIENT BACKING MAY BE SUBSTITUTED FOR CARPET AND PADDING IN KITCHEN...SOUND...

Last Modified: 01/31/2024

MPE Plan Check Thresholds.pdf

MECHANICAL THRESHOLDS • Commercial kitchens, barber/beauty salons, or nail salons...• Kitchen hoods (Type I or II) • Commercial HVAC systems...

Last Modified: 05/14/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet