Showing results for "dWA 0812 2782 5310 Jasa Pemasangan Kitchen Set ACP Serat Kayu Berkualitas Polanharjo Klaten"
& BATHROOM, REMOVE A NON-LOAD BEARING WALL IN KITCHEN, REPLACE WATER HEATER AND...TO INCLUDE: (1) KITCHEN HOOD, (12) ELECTRICAL OUTLETS, (7)...
Last Modified: 05/01/2025
INTERIOR REMODEL; LIVING ROOM, BATHROOM, KITCHEN, LAUNDRY, CONVERT FAMILY ROOM INTO...REMODEL KITCHEN; 2. REMOVE KITCHEN...
Last Modified: 04/04/2025
PRIVATE OPEN SPACE PER UNIT: (NOT REQ'D IN MDC-2 ZONE) LANDSCAPING (INCLUDES SET...REVIEW SWITCH LOCATION WITH ARCHITECT PRIOR TO WIRING OR...
Last Modified: 02/12/2024
officers, employees agencies, boards, commissions, or City Council to attack, set...| Woolueae S2 COUNTER SPACE IN KITCHEN SHALL HAVE A MAXIMUM...
Last Modified: 08/03/2026
REMODEL (E) KITCHEN & LAUNDRY (141 SF)....INTERIOR REMODEL: REMOVAL OF (E) INTERIOR WALLS AT KITCHEN AND LIVING...
Last Modified: 06/15/2026
) ELECTRICAL OUTLETS, (3) ELECTRICAL FIXTURES, (4) PLUMBING FIXTURES, AND (1) KITCHEN...PROPOSED NEW KITCHEN....EXISTING...
Last Modified: 08/11/2025
SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...
Last Modified: 10/13/2022
Last Modified: 10/20/2022
Last Modified: 10/27/2022
REMODEL FRONT PORCH, 1ST REMODEL: KITCHEN, FAMILY ROOM 724 SF, ROOF ALTERATION....REMODELED KITCHEN, (E) BATHROOM, LIVING ROOM, & OFFICE NOT...
Last Modified: 02/06/2026
and Alteration 09/25/2026Permit Final Final Date:Permit Status: NONSTRUCTURAL KITCHEN...Addition / Alteration 09/30/2026Permit Final Final Date:Permit Status: REMODEL...
Last Modified: 10/01/2026
C/O KITCHEN & BATHROOM SINKS AND 1 TOILET....EIGHT LIGHT FIXTURES, 12 OUTLETS, KITCHEN HOOD....remodel ((1) kitchen hood;...
Last Modified: 06/05/2025
and Alteration 01/31/2025Permit Final Final Date:Permit Status: NON STRUCTURAL KITCHEN...INCLUDES 26 ELECTRICAL OUTLETS AND 27 FIXTURES, 1...
Last Modified: 02/04/2025
BMC 10-1-603(E)(2)(A) AT LEAST 40 PERCENT OF THE LENGTH OF THE SECOND STORY IS SET...A301 FAR 1ST FLOOR: 1279.00 SF ± 20' - 3" 2' - 0" 241 SF LIVING 7 514 SF ...
Last Modified: 07/07/2021
SPACE PER UNIT: (NOT REQ'D IN MDC-2 & MDM-1 ZONE) LANDSCAPING (R4-ZONE) (INCLUDES SET...6 " 1 0 ' - 8 " 3 3 ' - 5 " 12' - 6 3/4" 7' - 7" 20' - 1 3/4" 112 SF ...
Last Modified: 07/25/2023
Los Angeles, CA 90010 (323) 939-0506 √ Lord's Kitchen Location rotates every week...Each program has its own eligibility requirements set by...
Last Modified: 09/14/2021
Status: Replace panel & add 20 light fixtures: 4 @ ea/bedroom, 9 living rm & 3 at kitchen...Final Date:Permit Status: SFD: 642 SF ADDITION, NEW MASTER BEDROOM, RE-LOCATED...
Last Modified: 01/02/2026
set by KPicha KPicha Sticky Note None set by KPicha KPicha Sticky Note None set..." Pla n 1 X 23 '-6 " Pla n 1 47...
Last Modified: 12/26/2023
When the oil eventu- ally needs to be disposed of, avoid pouring it down the kitchen...Set the bare tree at the curb or next to the dumpsters in...
Last Modified: 06/17/2026
Showing 121 to 140 of 2,459 entries.