Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Membangun Rumah Type 36 Scandinavian Murah Banyumanik Semarang"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Membangun Rumah Type 36 Scandinavian Murah Banyumanik Semarang.
Search Results

Appendix F - Noise Technical Report.pdf

The Proposed Project is comprised of four separate adjacent lots totaling 27,192...Existing Conditions The Proposed Project is comprised of four separate adjacent lots...

Last Modified: 01/07/2025

2024 STATS REPORT for website

- 2024 STATISTICS Animal Intake Below is a five year comparison showing the total...In 2024, the Burbank Animal Shelter took in a total of...

Last Modified: 07/22/2025

Burbank 2500 N Hollywood NOP_March 2024.pdf

The Parking Study found that based on the Project’s characteristics, a total of...of 1,183 spaces, under BMC Section 10-1-1415, a total of 1,021...

Last Modified: 03/05/2024

7-13-21 BCC - Attachment 1 - Random Draw 2021.pdf

of 9 applicants Total of 17 applicants Page 1 of 4 2021 BOARDS, COMMISSIONS...of 11 applicants Total of 27 applicants Page 2 of 4 2021...

Last Modified: 06/17/2021

BWP Electric ADU Plan Check Requirements

[email protected] Page 3 of 3 MAIN PROPERTY ADDRESS: NEW ADU ADDRESS: TOTAL...EXISTING AMPACITY TOTAL EXISTING ELECTRIC METERS ...

Last Modified: 11/15/2024

BWP Electric ADU Plan Check Requirements.pdf

[email protected] Page 3 of 3 MAIN PROPERTY ADDRESS: NEW ADU ADDRESS: TOTAL...EXISTING AMPACITY TOTAL EXISTING ELECTRIC METERS ...

Last Modified: 12/22/2023

MUSEXPO

<style type ="text/css"><!

Last Modified: 03/12/2025

Source Area Removal SVE Design Drawings 1

SQUARE FOOT STD STANDARD STR STRAIGHT SVE SOIL VAPOR EXTRACTION SW SIDEWALK TOT TOTAL..."x1/2"HX5"W - MILL FINISH ALUMINUM (ADA COMPLIANT) 1 PEMKO 315CN...

Last Modified: 03/18/2025

Attachment 8. FY 2022-23 Budget Public Hearing 5.24.22.pdf

Projected FY2025-26 Projected FY2026-27 Projected Years 6-10 Estimated Project Total...700,000 1,000,000 1,600,000 1,700,000 2,000,000 7,000,000 MUNICIPAL...

Last Modified: 05/12/2022

5-25-21 PH - Attachment 8 - FY 21-22 _CIP_Public Hearing 5.28.2021.pdf

Projected FY2024-25 Projected FY2025-26 Projected Future Years Estimated Project Total...PW 700,000 700,000 1,200,000 1,700,000 2,700,000 7,000,000 MUNICIPAL...

Last Modified: 05/13/2021

Public Works

Last Modified: 12/16/2025

Fire Hazard Reduction Program

The Fire Hazard Reduction Program (Brush Clearance) is a team effort between the Burbank Fire Department and property owners to help prevent wildfires and keep people and homes safe.

Last Modified: 04/16/2026

SB1383 Food Donation

Last Modified: 04/22/2026

Attachment 8 - Budget Public Hearing 6.4.24.pdf

Projected FY2027-28 Projected FY2028-29 Projected Years 6-10 Estimated Project Total...500,000 600,000 600,000 600,000 600,000 1,800,000 4,800,000 MUNICIPAL...

Last Modified: 05/24/2024

Attachment 4 – FY 2025-26 Funding Recommendations

Revolution Art therapy for homeless -$ -$ -$ 5,000.00$ 3,320.45$ 3,349.70$ Total...159,688.00$ 159,688.00$ 219,272.00$ 159,687.45$ 160,949.70$ ...

Last Modified: 05/29/2025

Planning_2021_3000 Empire Ave - SB 35 NOI - Incomplete Letter (12.28.2021).pdf

NUMBER AND TYPE OF UNITS....more than 10 residential units are proposed, at least 10 percent of the project's total...development will be paid at...

Last Modified: 01/07/2022

Planning_3001 W Empire Ave - SB 35 NOI Application Review (12.28.2021).pdf

NUMBER AND TYPE OF UNITS....more than 10 residential units are proposed, at least 10 percent of the project's total...development will be paid at...

Last Modified: 01/07/2022

Attachment 8.CIP - Budget Public Hearing 6.3.25

FY 2028-29 Projected FY 2029-30 Projected Years 6-10 Estimated Project Total...25128 VALLEY SKATE SHADE STRUCTURE PR 212,705 212,705 PARKS AND RECREATION...

Last Modified: 05/22/2025

Attachment 8 - Budget Public Hearing 6.13.23.pdf

Projected FY 2026-27 Projected FY 2027-28 Projected Years 6-10 Estimated Project Total...Lift Equipment Modernization PW 100,000 500,000 600,000 MUNICIPAL...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (1).pdf

Projected FY 2026-27 Projected FY 2027-28 Projected Years 6-10 Estimated Project Total...Lift Equipment Modernization PW 100,000 500,000 600,000 MUNICIPAL...

Last Modified: 06/02/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet