Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

Burbank AI FINAL.pdf

Units % of Total Housing Stock 2010 or later 298 24 322 0.8% 2000–2009...The table provides detailed insights, including total units...

Last Modified: 06/18/2025

Burbank AI FINAL (1).pdf

Units % of Total Housing Stock 2010 or later 298 24 322 0.8% 2000–2009...The table provides detailed insights, including total units...

Last Modified: 07/17/2025

Burbank AI FINAL (2).pdf

Units % of Total Housing Stock 2010 or later 298 24 322 0.8% 2000–2009...The table provides detailed insights, including total units...

Last Modified: 04/15/2026

2025 FEB ISSUED

TOTAL SF:3000....TOTAL SF:4700....TOTAL SF:3500.

Last Modified: 03/10/2025

Attachment C - Objective Standards Consistency Matrix.pdf 1

Ten percent of the total units of a newly constructed Condominium Project or Planned...The Project is proposing to set aside 10% of the unit...

Last Modified: 06/26/2023

Attachment C - Objective Standards Consistency Matrix.pdf

Ten percent of the total units of a newly constructed Condominium Project or Planned...The Project is proposing to set aside 10% of the unit...

Last Modified: 05/08/2023

SR - CDBG Annual Action Plan

how the funds will be spent. 3 CDBG Available Resources Of the total...(capped at 20% of new entitlement funds – City budgeted item) $213,828.60 ...

Last Modified: 06/04/2026

Urban Lot Split Tentative Map Application_11082024

Reason for proposed parcel division: Total area of existing parcel: Average slope...of existing parcel: Number of new parcels proposed: Total...

Last Modified: 11/13/2024

20210301 - FY 17-18 Annual Report

administering the activities described in paragraphs (2) and (3) of subdivision (a), Total...housing units have been developed: 270 Rental Units +55 Ownership Units ...

Last Modified: 04/30/2021

SR - HOME ARP final 3.8.23.pdf

THE FILING OF APPLICATIONS AND CERTIFICATIONS FOR HOME-ARP FUNDS TOTALING $1,896,632...A total of 77 were in interim housing, while 187 were...

Last Modified: 03/16/2023

328 N San Fernando Blvd_CUP_Plan Set

Zoning Information: BCC-1: Burbank Center Commercial Retail-Professional Zone Total...Building Area (Exterior Walls): 5056SF Total Lot...

Last Modified: 10/14/2025

ApxF_PaleontologicalResourcesAssessmentReport.pdf

The commercial building and ancillary structures located on the Project Site total...The Project would provide a total of 334 studio units, 364...

Last Modified: 07/09/2021

20210101_FY 2020-21 Annual Action Plan.pdf

Total Persons Assisted 25 5 unduplicated people 6 Preserving Affordable...Based on the data collected, from 2019, the City’s total...

Last Modified: 05/20/2021

FY 24-25 Annual Action Plan (1).pdf

Persons Assisted 1,425 Total Persons Assisted 25 Household Housing Unit 15...Older adults aged 65 and above totaled...

Last Modified: 04/15/2026

Consistency Matrix - SB35 NOI - 910 S Mariposa

that include at least ten percent of the total units for low income households,...more than one (1) Density Bonus, but in no event can the total...

Last Modified: 03/19/2024

20210412-Single-Audit-Report-June-30-2020.pdf

Offenders for Driving While Intoxicated 20.608 PT20015 81,571 - Total...: Homeland Security Grant Program 97.067 UASI C-129267 68,134 - ...

Last Modified: 04/12/2021

SB 35 Letter & Attachments.pdf

of 10.2 percent of the total units being affordable....of 10.2 percent of the total units being affordable....of 10.2 percent of the...

Last Modified: 03/04/2022

Attachment 4..pdf

Projects that generate a total combined weight of construction and demolition waste...Projects that generate a total combined weight of...

Last Modified: 10/27/2022

2814 Empire Plans.pdf

Projects that generate a total combined weight of construction and demolition waste...Projects that generate a total combined weight of...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

Parking 20 1) 0' front yard instead of 15'-2"FLOOR 1 BRM 2 BRM 3 BRM TOTAL...Projects that generate a total combined weight of...

Last Modified: 10/20/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet