Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Gravel Paver Terpercaya Pekanbaru Riau"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Gravel Paver Terpercaya Pekanbaru Riau.
Search Results

20201216.AdoptedBudget17_18.pdf

Issue all employee and vendor tax statements accurately and within applicable deadlines...Ensure all employee and vendor payments are processed on...

Last Modified: 12/16/2020

20201210.AdoptedCIP19_20.pdf

Burbank Athletics Walk of Fame, located at George Izay Park, does not have blank pavers...After a request for proposal process, the vendor was...

Last Modified: 12/10/2020

20220901-FY-2022-23-Adopted-CIP

Future expenditures will be through contracting with a vendor for the buildout of...Future expenditures will be through contracting with a vendor...

Last Modified: 09/01/2022

ApxG1_Phase I ESA - Part 1.pdf

whatsoever under any course of action against Partner, its officers, employees, vendors..., indemnify and hold Partner, Client and their respective officers, employees,...

Last Modified: 07/09/2021

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Dedication, Naming or Renaming of a City Facility Based on current rate set by vendor...Based on current rate set by vendor 5 Description...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Dedication, Naming or Renaming of a City Facility Based on current rate set by vendor...Based on current rate set by vendor 5 Description...

Last Modified: 03/09/2023

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

DEIR Appendix G-1 (LaTerra).pdf

or gravel-sand mixtures, little or no fines GP Poorly graded gravels or gravel-sand...mixtures, little or no fines GM...

Last Modified: 05/04/2021

5. Art in Public Places Committee_Redacted.pdf

Negotiations: § Influenced labor union contracts, leveraging crisis management and vendor

Last Modified: 06/16/2022

1036 Sherlock Dr_HDP Plans_v2

during construction by contractor, any shop drawings, or any material delivered by vendors

Last Modified: 06/12/2024

2025 NOV ISSUED

Maintenance $13,000.00Valuation: PARTIAL COMMERCIAL REROOF - REMOVE (E)HOT MOP AND GRAVEL

Last Modified: 12/01/2025

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

FOR PURPOSES OF PLANTING AND PAVERS STANDARDS ONLY THE FRONT YARD SHALL INCLUDED

Last Modified: 05/30/2024

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet