Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan.
Search Results

Preliminary_Hydrology_Report.pdf

California KHR Associates 5 Runoff flows westward into Mariposa Street, which is paved

Last Modified: 01/11/2024

20240502-FY-2024-25-Proposed-Budget-COMPLETE

Residential Pavement Rehabilitation Project to complete the concrete work prior to paving...Residential Pavement Rehabilitation Project to complete the concrete work prior...

Last Modified: 05/02/2024

9.20.2023_3000 W Empire Ave_Status_Letter and Attachments.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...Standards (Section 10-1-1417) All off-street parking areas shall be graded, ...

Last Modified: 10/02/2023

Appendix D - Historic Resource Assessment.pdf

landscaped front yard and a concrete driveway on the south side that leads to a paved...hedges in the front yard and a concrete driveway on the north side leads to a ...

Last Modified: 01/07/2025

Attachment 2.pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 05/02/2023

Unrepresented Mid-Management Employees.pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 01/20/2021

CCW

Read how to file for a CCW with the Burbank Police Department.

Last Modified: 10/13/2025

6. Burbank Cultural Arts Commission_Redacted.pdf

• Develop and manage vendor and subcontractor relationships - specifically in the...support organizations to resolve financial issues, interfaced with subcontractors,...

Last Modified: 06/15/2023

20210204-Bicycle-Master-Plan-001.pdf

BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...

Last Modified: 02/05/2021

Attachment 1.pdf

Additional impacts to street triggered by this project could extend the paving...All off-street parking areas and accessways shall be graded,...

Last Modified: 10/27/2022

20201217-Bicycle-Master-Plan-001.pdf

BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...

Last Modified: 12/17/2020

ApxA2_ConstructionHealthRiskAssessment.pdf

2023 8 122 0 122 0 Building Construction 2024 1/1/2024 12/31/2024 8 366 0 273 93 Paving...05 0 Building Construction 2024 0 0.11167949 0.0059963 0 0.00012285 6.59589E-06...

Last Modified: 07/09/2021

20210401_3700RD_Initial_Study_Review_Draft.pdf

As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...

Last Modified: 04/12/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...

Last Modified: 11/29/2021

3001 SB35 - Plans.pdf

All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...

Last Modified: 06/26/2023

20210519_504_Hampton_Road.pdf

LANDSCAPE DETAILS AND SPECIFICATIONS PROPOSED COVERED PATIO PERMEABLE STONE PAVING...BELLOW THE STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 4" ABOVE EARTH OR 2" ABOVE...

Last Modified: 05/18/2021

WMR 7.5.24.pdf

eTRM) • Lighting calculations (wattage savings x operating hours) • Engineered vendor...December 28, 2023, the long-duration battery for the eco-campus was delivered by ...

Last Modified: 07/05/2024

7. Infrastructure Oversight Board_Redacted.pdf

philanthropic teaming agreements, corporate infrastructure contracts, consulting/vendor...Negotiated with vendors to achieve lower costs of...

Last Modified: 06/15/2023

FY 2025-26 Adopted Budget_Complete

300,000 300,000 300,000 1,800,000 3,300,000 Paving...their vendor record....a development standstill for the next two...

Last Modified: 09/11/2025

Complaint - Conformed.pdf

A beer vendor was also observed entering and exiting the patio with metal beer

Last Modified: 04/14/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet