Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Pengadaan Geomat Wilayah Kepulauan Aru Maluku"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Pengadaan Geomat Wilayah Kepulauan Aru Maluku.
Search Results

6. Senior Citizen Board_Redacted

annual budgets, develop request for information and requests for proposals from vendors

Last Modified: 06/13/2024

20201210.AdoptedCIP20_21.pdf

On-site vendor demonstrations will occur in late January 2020, with a final selection...Vendor hardware requirements to support the new systems are...

Last Modified: 12/10/2020

Attachment 1, Exhibit B - Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

BFF MOU - 2025-2028 -Fully Executed.pdf

It is recognized that through the City's bid process, the successful vendor...the alternate purchase and be reimbursed up to the cost negotiated, with said...

Last Modified: 08/26/2025

BFF MOU - 2022-2025 Final, signed.pdf

It is recognized that through the City's bid process, the successful vendor for...the alternate purchase and be reimbursed up to the cost negotiated, with said...

Last Modified: 05/12/2023

Att3 - CDBG Applications

2027ATTACHMENT 3 - 79 Roof to be constructed depending on availability of materials, vendors...system within 6 months of funding receipt (subject to availability of...

Last Modified: 06/04/2026

JACKALOPE INDIE ARTISAN FAIR

text-transform: none;widows: 2;word-spacing: 0.0px;">For a full list of participating vendors

Last Modified: 11/20/2023

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

Attachment 1 - Resolution

The Subrecipient shall verify the status of a contractor or vendor to maintain the

Last Modified: 05/29/2025

WMR 7.17.26 (1).pdf

Jul - Apr) Remaining Total Cash Authorized Cash Cash Contract Cash Consultant/Vendor

Last Modified: 07/17/2026

Att1 - Resolution

The Subrecipient shall verify the status of a contractor or vendor to maintain the

Last Modified: 06/04/2026

FY 2026-27 Adopted CIP Book FINAL

entire system, and staff will pursue sole source justification for the selected vendor...Fire Department’s Telestaff staffing application to the cloud in accordance with...

Last Modified: 09/10/2026

20201210.AdoptedBudget18_19.pdf

with Burbank Water & Power (BWP) to issue a Request for Proposal and selected a vendor...Ensure all employee and vendor payments are processed on...

Last Modified: 12/10/2020

20260630-FY-26-27-Adopted-Fee-Schedule

Page (3) Subscription Service for Revisions Varies Based on current rate set by vendor...Products Annual (FY)/ Vehicle (21) Rental Equipment Annual (FY) (22) Sidewalk...

Last Modified: 06/29/2026

20260814-FY-26-27-Adopted-Revised

Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate set by...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate set by...

Last Modified: 09/22/2026

ApxI_NoiseandVibrationImpactStudy.pdf

number of daily heavy-duty construction trucks including 70 haul trucks and 22 vendor...Construction traffic noise has been calculated assuming that the number of haul...

Last Modified: 07/09/2021

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

2026 AUG ISSUED

components is UNIVERSAL NAVA ELECTRIC 8185909667 91205CAGLENDALE Contractor 1305

Last Modified: 09/01/2026

3-1-22 - ED - Attachment 1_Redacted

and distribute minutes • Draft correspondence and/or documents to clients and vendors

Last Modified: 02/04/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet