Showing results for "dWA 0821 1305 0400 [[Adefa]] Biaya Pengadaan Geocomposite Landfill Terdekat Sleman DI Yogyakarta"
There is no need to pothole the existing 12" DI waterline that connects to the...JB 142 Smiranda Burbank - BWP Water 10/16/2025 Plans 16 Utilities Plans 12"...
Last Modified: 07/17/2026
IS NO OBSERVABLE EVIDENCE OF SITE USE AS A SOLID WASTE DUMP, SUMP, OR SANITARY LANDFILL
Last Modified: 10/13/2022
Last Modified: 10/20/2022
Last Modified: 10/27/2022
been subdivided over the years and only the house and barn remained when Jeffries died
Last Modified: 11/29/2021
AN 77 SNMiranda Burbank - BWP Water 2/17/2026 Plans 18 Utilities Plans 8" DI
Last Modified: 06/22/2026
projects that generate potentially significant levels of air pollutants, such as landfill...projects that generate potentially significant levels of air pollutants, such...
Last Modified: 03/31/2021
projects that generate potentially significant levels of air pollutants, such as landfill...Lane Configurations Traffic Volume (veh/h) 196 548 27 129 508 50 66 841 95 176...
Last Modified: 11/05/2026
Contractor License Fee $88.15 Per Each Vehicle Used in the Business/Annual (I) Landfill...Outside public dumping not allowed to City's landfill....
Last Modified: 06/20/2022
hauler's gross revenues Quarterly (K) AB 939 Late Fees $20.00 Per Business Day (L) Landfill...Outside public dumping is not allowed at the City's...
Last Modified: 12/12/2024
gross revenues Quarterly (L) AB 939 Late Fees $21.60 Per Business Day (M) Landfill...Outside public dumping is not allowed at the City's landfill.
Last Modified: 05/01/2025
Contractor License Fee $97.17 Per Each Vehicle Used in the Business/Annual (J) Landfill...Outside public dumping is not allowed at City's...
Last Modified: 09/20/2023
Last Modified: 08/07/2025
Last Modified: 12/12/2025
Last Modified: 09/04/2025
Last Modified: 09/05/2025
Showing 1,061 to 1,080 of 1,162 entries.