Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geocell Retaining Wall Terpercaya Tabanan Bali.
Search Results

818 Stephen Road View Study.pdf

The applicant proposes demolition of existing walls on the first floor to accommodate...All elements of the proposed addition, including roof, windows, and...

Last Modified: 11/17/2022

2025 OCT FINALED

Addition and Alteration 10/17/2025Permit Final Final Date:Permit Status: OPEN WALL...SUBMITAL FOR 5 STORY COMMERCIAL OFFICE BUILDING - CORE AND SHELL ONLY- CURTAIN...

Last Modified: 11/03/2025

20210101_2814_W_Empire_Ave_NOI_Final.pdf

When adequate exterior wall space is not available, a separately locked, clearly...All screen walls, which are a part of, or adjacent to, the ...

Last Modified: 08/30/2021

Appendix D_Cultural Resources Assessment.pdf

(Rincon) was retained by GPA Consultants to conduct a cultural resources assessment...(Rincon) was retained by GPA Consultants to conduct a...

Last Modified: 12/13/2024

Community Meeting 5-31-17.pdf

to locate affordable housing, help with completing apartment applications, and retaining

Last Modified: 04/19/2021

DANCING-ALCOHOL.pdf

It is further understood, that the City of Burbank retains continuing jurisdiction

Last Modified: 03/12/2021

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

, not the square footage of walls)....walls = Demolition Percentage....Length of walls are to include interior and...

Last Modified: 03/27/2025

2021_Planning_706 East Verdugo Ave - Plans.pdf

-0" 1 SITE PLAN KEY NOTES SITE LEGEND PROPERTY LINE EXISTING CONCRETE BLOCK WALL...(E) WROUGHT IRON FENCE (E) CONCRETE WALK 1 (E) CONCRETE BLOCK...

Last Modified: 09/07/2021

Lateral Pipe Bursting Specs.pdf

The minimum wall thickness of the polyethylene pipe shall meet the following: Depth...scar, or other deleterious fault greater in depth than ten percent (10%) of the...

Last Modified: 04/13/2021

Legislative Platform 2025 FINAL WEB

Advocate for incentives to retain entertainment and animation industry jobs and...Retain funding for Local Benefits efforts for exclusive local...

Last Modified: 04/02/2025

Burbank Legislative Platform 2026 2.2.26 for web

Advocate for incentives to retain entertainment and animation industry jobs and...Retain funding for Local Benefits efforts for exclusive local...

Last Modified: 02/03/2026

Burbank Legislative Platform 2026 2.2.26 for web.pdf

Advocate for incentives to retain entertainment and animation industry jobs and...Retain funding for Local Benefits efforts for exclusive local...

Last Modified: 02/03/2026

Burbank Legislative Platform 2026 2.2.26 for web (1).pdf

Advocate for incentives to retain entertainment and animation industry jobs and...Retain funding for Local Benefits efforts for exclusive local...

Last Modified: 02/03/2026

CDD 12.09.2025 - SR PH - Intro. Ord. Vocational School ZTA

which includes trade/vocational schools, as one of four emerging industries to retain...Strategies by diversifying the City’s economic base and strengthening opportunities...

Last Modified: 11/26/2025

202101_3201 Scott Rd - Public Mailing Notice_final.pdf

The project also includes new landscaping improvements and new fences/walls at the...The project also includes new landscaping improvements and new...

Last Modified: 06/03/2021

526 S Sunet Cyn View Study Final.pdf

The massing of the 635-square-foot second-story addition is set back from the wall...All elements of the proposed additions, including the roof, windows, doors, and ...

Last Modified: 01/13/2022

Attachment 10 - Burbank Municipal Code Section 10-1-1936.pdf

adequate in size and shape to accommodate the use and all of the yards, setbacks, walls...Fences and walls.

Last Modified: 09/06/2023

Attachment 10 - Burbank Municipal Code Section 10-1-1936.pdf

adequate in size and shape to accommodate the use and all of the yards, setbacks, walls...Fences and walls.

Last Modified: 09/14/2023

2025 MAR SPV

PV modules (10.4KW) with 26 micro-inverters; install 2 ESS units on an exterior wall...Inc. inverter and 1 source-circuit combiner; install 1 ESS unit on an exterior...

Last Modified: 04/04/2025

Attachment 1 - 526 S Sunet Cyn View Study

The massing of the 635-square-foot second-story addition is set back from the wall...All elements of the proposed additions, including the roof, windows, doors, and ...

Last Modified: 02/16/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet