Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Pati Jawa Tengah.
Search Results

20210107-2012-Series-A-BWP-Revenue-Refunding-Bonds.pdf

2400 2400] /PageSize [612.000 792.000] >> setpagedevice 2012-05-03T22:27:20-0400

Last Modified: 01/07/2021

20201210.AdoptedBudget19_20.pdf

STAFF YEARS 11.740 11.800 11.800 * The Communications Manager position is being filled...Conduct a recruit class to fill vacancies from...

Last Modified: 12/10/2020

ApxK_Transportation Study.pdf

0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...

Last Modified: 07/09/2021

20201221-AFR-Year-Ending-June-30-20.pdf

Special thanks go out to the City of Burbank families for participating in fun filled...the remaining estimated cost of $23,915 as the remaining estimated capacity is...

Last Modified: 04/12/2021

ACFR 2022-2023

the remaining estimated cost of $26,957 as the remaining estimated capacity is filled...by comparing two topographic surfaces against one another to generate the volume...

Last Modified: 02/08/2024

20210401_3700RD_Appendix_E.pdf

The sampler was retrieved from the subsurface and the soil-filled liner is removed

Last Modified: 04/12/2021

7-13-21 BCC - 2. Sustainable Burbank Commission_Redacted.pdf

after a major company restructuring by pivoting quickly to reassign staff and fill

Last Modified: 06/17/2021

Appendix 11.1E_Phase I II ESA.pdf

The sampler was retrieved from the subsurface and the soil-filled liner is removed

Last Modified: 11/29/2021

2022-11 Treasurer's Report REVISION.pdf

With people preferring remote work, employers have also had to pay a premium to fill

Last Modified: 04/04/2023

2025 AUG ISSUED

AVE Grading & Shoring $100,000.00Valuation: GRADING FOR SITE PREP (CUT 644 CY, FILL

Last Modified: 09/02/2025

Prevailing Wage Report.pdf

Local Hire policies, which set targets for the percentage of workers or job-hours filled

Last Modified: 05/16/2025

2025 SEPT ISSUED

Uncertified fill (275 SF). See plan.

Last Modified: 10/06/2025

20220901-FY-2022-23-Adopted-CIP

/ Fire Headquarters (Fire Station 11), and will design, engineer, and construct lightweight...software robots to automate repetitive, routine work between multiple...

Last Modified: 09/01/2022

Burbank 25-26 CIP PDF Final

All cracks will be filled and sealed to create a smoother surface that supports proper...In order to continue fill-sequencing and uninterrupted...

Last Modified: 09/11/2025

ACFR 2024

the remaining estimated cost of $27,927 as the remaining estimated capacity is filled...by comparing two topographic surfaces against one another to generate the volume...

Last Modified: 01/27/2025

ACFR 2025

the remaining estimated cost of $28,598 as the remaining estimated capacity is filled...by comparing two topographic surfaces against one another to generate the volume...

Last Modified: 12/23/2025

2026.06.18 Pet. Metro's McKenna Declaration ISO PI Motion.pdf

MAKE TEXTS SMALLER AND DO NOT FILL SURVEY STATION TEXT WITH WHITE 1 Njohnston

Last Modified: 06/22/2026

2021_Planning_ Burbank2035 Draft Environmental Impact Report.pdf

legislation will likely be developed between now and 2035 to assist the City in filling...USACE) before engaging in any activity that involves any discharge of dredged or...

Last Modified: 07/29/2021

Planning_2021_Burbank2035 DEIR.pdf

legislation will likely be developed between now and 2035 to assist the City in filling...USACE) before engaging in any activity that involves any discharge of dredged or...

Last Modified: 12/02/2021

20210107-2017-Tax-Allocation-Refunding-Bonds.pdf

the remaining estimated cost of $22,881 as the remaining estimated capacity is filled...APPENDIX H - State Department of Finance Approval Letter ...

Last Modified: 01/07/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet