Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pusat Geocell Retaining Wall Terdekat Kepulauan Sula Maluku Utara"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pusat Geocell Retaining Wall Terdekat Kepulauan Sula Maluku Utara.
Search Results

2306 Kenneth Road - Project Plans.pdf

NEW WALLS EXISTING WALLS TO BE REMOVED SMOKE DETECTOR 120V HARD WIRED WITH BATTERY...NEW WALLS EXISTING...

Last Modified: 05/10/2023

SIGN APPLICATION

TYPE OF SIGN (Please indicate the Quantity and Size on the Space Provided) WALL...MOUNTED SIGN: ________________ # FREE-STANDING SIGN: ________________ # MULTIPLE...

Last Modified: 02/09/2026

2025 OCT SPV

PV modules (6.96KW) with Tesla Inc. inverter; install 1 ESS unit on an exterior wall...PV modules (2.87KW) with Tesla Inc. inverter; install 1 ESS unit on an exterior...

Last Modified: 11/03/2025

20260630-FY-26-27-Adopted-Fee-Schedule

Additional retaining wall $251.09 Each additional 50 LF (b) Special Design, 6'...-12' high (i) Up to 50 LF $318.79 Up to 50 LF (ii) Additional...

Last Modified: 06/29/2026

20260814-FY-26-27-Adopted-Revised

In the event a consultant is retained, the cost shall include the total cost of the...) Additional retaining wall $251.09...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

In the event a consultant is retained, the cost shall include the total cost of the...) Additional retaining wall $251.09...

Last Modified: 09/22/2026

2021_Planning_ 4301 Riverside Plans.pdf

the property of the design professional copies of the drawings and specifications retained...the property of the design professional copies of the drawings and...

Last Modified: 06/14/2021

Attachment 2 - Enforceable Agreements (1).pdf

of the Project's conditions of approval: • TCR-1: The Project applicant shall retain...of the Project’s conditions of approval; ● TCR-1: The Project applicant shall...

Last Modified: 11/21/2024

Attachment 2 - Enforceable Agreements

of the Project's conditions of approval: • TCR-1: The Project applicant shall retain...of the Project’s conditions of approval; ● TCR-1: The Project applicant shall...

Last Modified: 11/19/2024

Appeal - WTF AUP - Exhibit A - Resolution (FINAL)

adequate in size and shape to accommodate the use and all of the yards, setbacks, walls...building- mounted wireless facilities shall be located within existing building...

Last Modified: 07/22/2024

328 N San Fernando Blvd_CUP_Plan Set

Burbank Center Commercial Retail-Professional Zone Total Building Area (Exterior Walls...TO REMAIN EXISTING DEMISING WALL EXISTING DEMISING...

Last Modified: 10/14/2025

FY 2024-24 Adopted Fee Schedule revised

In the event a consultant is retained, the cost shall be the total cost of the services...Additional retaining wall...

Last Modified: 12/12/2024

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

In the event a consultant is retained, the cost shall be the total cost of the services...Additional retaining wall...

Last Modified: 09/04/2025

FY 2024-25 Adopted Fee Schedule

In the event a consultant is retained, the cost shall be the total cost of the services...Additional retaining wall...

Last Modified: 06/27/2024

20230901-FY-23-24-Fee-Schedule_Final

Additional retaining wall $230.00 Each additional 50 LF (b) Special Design, 6'...-12' high (i) Up to 50 LF $292.00 Up to 50 LF (ii) Additional...

Last Modified: 09/01/2023

Attachment 4 - Planning Commission Staff Report dated July 22, 2024

equipment will be centrally located on the roof behind an existing mechanical wall...adequate in size and shape to accommodate the use and all of the yards, setbacks,...

Last Modified: 10/18/2024

3333 Brace Canyon Road - HDP - Approval Letter

, not the square footage of walls)....walls = Demolition Percentage....Length of walls are to include interior and...

Last Modified: 08/07/2024

2026 APR SPV

PV modules (13.64KW) with Tesla Inc. inverter; install 1 ESS unit on an exterior wall...PV modules (12.15KW) with 30 micro-inverters; install 1 ESS unit on an exterior...

Last Modified: 05/28/2026

2019 W Magnolia - Plans

IN WALLS WHERE SCHEDULED ON SHT. A110. 3....MOUNTED TBD 12X24 EQ-34 1 SHELVING, WALL MOUNTED TBD 12X72 EQ-35 1 SHELVING,...

Last Modified: 03/25/2026

9.20.2023_3000 W Empire Ave_Status_Letter and Attachments.pdf

A revised Hydrology Study dated January 27, 2023, states that the proposed retaining...wall elevation of 658.77 feet will be used to mitigate the...

Last Modified: 10/02/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet