Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Vendor Geomembran Terdekat Halmahera Timur Maluku Utara"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Vendor Geomembran Terdekat Halmahera Timur Maluku Utara.
Search Results

20201210.AdoptedBudget19_20.pdf

Increased the number of vendors and other payees receiving payment by electronic...Continue to expand and grow number of vendors and others...

Last Modified: 12/10/2020

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

., from worker, vendor, and hauling trips)....timing/phasing, and hours of duration for construction equipment, as well as vendor...BMC Section...

Last Modified: 12/13/2024

Att13 - Draft Environmental Impact Report

., from worker, vendor, and hauling trips)....timing/phasing, and hours of duration for construction equipment, as well as vendor...BMC Section...

Last Modified: 11/05/2026

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Page (3) Subscription Service for Revisions Varies Based on current rate set by vendor...Based on current rate set by vendor 4 Description...

Last Modified: 06/20/2022

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 09/20/2023

25-4,034 Adopting by Reference 2025 CA Building Standards Code

The vendor or facility that the applicant proposes to use to collect or receive...Receipts from a licensed vendor or facility that collected or...

Last Modified: 11/24/2025

20230630-FY-23-24-Fee-Schedule-Final.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 07/10/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Vehicle (20) Promoter Annual (FY) (21) Rental Equipment Annual (FY) (22)...

Last Modified: 09/01/2023

7-13-21 BCC - 2. Sustainable Burbank Commission_Redacted.pdf

Assist in the drafting, review, and negotiation of contracts, including vendor and

Last Modified: 06/17/2021

Prevailing Wage Report.pdf

Indirect Costs – Number of Vendors As stated above, the Philips and Littlehate 2015

Last Modified: 05/16/2025

BMA.pdf

the effected employees, their supervisors and/or Department Directors, or to a vendor

Last Modified: 01/20/2021

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 12/26/2023

Decision Letter - 2710 Winona Ave - AUP - 2.28.26 (all attachments)

ABBREVIATIONS ELECTRICAL LEGEND AAV ALTERNATE ACCESS VENDOR ACCA ANTENNA CABLE ASSEMBLY...describes the signage/barriers that were installed or removed by the...

Last Modified: 03/02/2026

Civitan Jamboree Celebration

opportunity to learn more about sports recreation activities by visiting the vendor

Last Modified: 06/23/2022

Att10 - Planning Commission Resolution, Staff’s Report, and Minutes from the October 12, 2026, Planning Commission Meeting

access routes to and from the Project site due to movement of construction workers, vendors...generate a maximum of 198 one-way construction worker trips (99 round trips)...

Last Modified: 11/05/2026

The Burbank2035 General Plan

fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and Vendors...Equipment and Business Practices Give preference to qualified contractors and...

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and Vendors...Equipment and Business Practices Give preference to qualified contractors and...

Last Modified: 11/17/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet