Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Vendor Geomembrane Sanitary Terpercaya Kampar Riau"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Vendor Geomembrane Sanitary Terpercaya Kampar Riau.
Search Results

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 09/05/2025

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 09/04/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 09/17/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 12/12/2025

20250625 (3).fy25_26feescheduleadopted.pdf

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 03/18/2026

7-13-21 BCC - 4. Transportation Commission_Redacted.pdf

• Reduced costs by negotiating rates and terms with over 20 vendors including laboratories

Last Modified: 06/17/2021

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

The vendor or facility that the applicant proposes to use to collect or receive that

Last Modified: 06/30/2025

1310 E Tujunga Ave - PLANS

ANY WASTE WATER FROM WASHING VBEHICLES OR EQUIPMENT MUST BE DISCHARGED TO THE SANITARY...ANY WASTE WATER FROM WASHING VBEHICLES OR EQUIPMENT MUST BE DISCHARGED TO THE...

Last Modified: 04/03/2026

20210401_3700RD_Initial_Study_Review_Draft.pdf

The City of Burbank Public Works Department owns and operates the City’s sanitary...timing/phasing, and hours of duration for construction equipment, as well as...

Last Modified: 04/12/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

The City of Burbank Public Works Department owns and operates the City’s sanitary...timing/phasing, and hours of duration for construction equipment, as well as...

Last Modified: 11/29/2021

The Burbank2035 General Plan

experienced  sewage  spills  associated  with  hydraulic  capacity  deficiencies, a Sanitary...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors...

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

experienced  sewage  spills  associated  with  hydraulic  capacity  deficiencies, a Sanitary...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors...

Last Modified: 11/17/2021

Burbank2035_Updated (002)

not experienced sewage spills associated with hydraulic capacity deficiencies, a Sanitary...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors...

Last Modified: 03/24/2026

20260421-GeneralPlan-001.pdf

not experienced sewage spills associated with hydraulic capacity deficiencies, a Sanitary...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and...

Last Modified: 04/21/2026

Plans formal submittal #2_Part4

MANAGEMENT WM7 - CONTAMINATION SOIL MANAGEMENT WM8 - CONCRETE WASTE MANAGEMENT WM9 - SANITARY

Last Modified: 11/14/2024

Plans formal submittal #2_Part4 (1).pdf

MANAGEMENT WM7 - CONTAMINATION SOIL MANAGEMENT WM8 - CONCRETE WASTE MANAGEMENT WM9 - SANITARY

Last Modified: 11/14/2024

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Municipal Code Charges (1) Burbank Municipal Code Varies Based on current rate set by vendor...Page (3) Subscription Service for Revisions Varies Based on current rate...

Last Modified: 03/17/2026

7-13-21 BCC - 1. Infrastructure Oversight Board_Redacted.pdf

Answer phones -assist customers, vendors and tenants, screen calls and messaging

Last Modified: 06/17/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet