Showing results for "dWA 0821 1305 0400 Biaya Hidroseeding Land Scaping Hijau Sumbawa Barat Nusa Tenggara Barat"
Site Information Current Land Use Designation Proposed Zoning and Maximum Density...this site have Inclusionary Zoning or occupancy restrictions that run with the...
Last Modified: 06/04/2024
Last Modified: 06/06/2024
The Project Site is zoned R-3 with a General Plan Land Use designation of Medium...the R-1, R-3, and R-4 zoning and the low, medium, and high-density residential...
Last Modified: 09/15/2025
Last Modified: 04/14/2026
The LAX Master Plan EIS/EIR water demand factors were developed for various land...Proposed land use is based on the Project Description in the...
Last Modified: 03/31/2021
the City will require long-term affordable housing restrictions to run with the land...Governmental regulations through the implementation of land...
Last Modified: 05/20/2021
Firearm/Ammunition Retail Uses Current regulations in the BMC concerning the land...firearms or ammunition to allow staff time to study, analyze, and propose...
Last Modified: 09/06/2023
Last Modified: 07/14/2022
Firearm/Ammunition Retail Uses Current regulations in the BMC concerning the land...firearms or ammunition to allow staff time to study, analyze, and propose potential...
Last Modified: 07/06/2023
Last Modified: 08/11/2022
monuments shall be located and referenced by or under the direction of a licensed land...surveyor or licensed civil engineer legally authorized to practice...
Last Modified: 04/13/2021
Last Modified: 12/28/2021
Last Modified: 05/09/2024
Last Modified: 05/25/2023
Landing at doorways shall be 1:48 max....Landing at doorways shall be 1:48 max....Landing at doorways shall be 1:48 max.
Last Modified: 06/29/2023
Last Modified: 05/02/2023
n . -37- Los AnclClC's Land and \\'<lt~r Comp....Lancaster, Willi~m Land Ti tle Insurance COffip<1ny, as Trustee ...
Last Modified: 06/10/2021
site is zoned M-2 (General Industrial) with a Regional Commercial General Plan Land
Last Modified: 10/27/2022
Show all site stairs, treads, risers, handrails, guardrails, and landings and retaining
Last Modified: 11/19/2024
Funds received during the year $624,548.26 included: •nterest = $551,563.28 •Land
Last Modified: 02/14/2025
Showing 781 to 800 of 1,398 entries.