Showing results for "dWA 0821 1305 0400 Harga Hydroseeding Land Scaping Hijau Palembang Sumatera Selatan"
., land, buildings, utility and general government infrastructure, machinery and...other than buildings, infrastructure (roads, sidewalks, land...
Last Modified: 04/12/2021
HEIGHT PERCENT OF LOT COVERAGE NUMBER OF PARKING SPACES CURRENT ZONING CURRENT LAND...USE 74'-3" 34% 54 M-2 GENERAL INDUSTRIAL VACANT LAND...
Last Modified: 07/13/2023
Last Modified: 07/14/2023
monuments shall be located and referenced by or under the direction of a licensed land...surveyor or licensed civil engineer legally authorized to practice...
Last Modified: 04/13/2021
Last Modified: 06/23/2021
Last Modified: 02/25/2022
Last Modified: 04/22/2022
Landing at doorways shall be 1:48 max....Landing at doorways shall be 1:48 max....Landing at doorways shall be 1:48 max.
Last Modified: 06/26/2023
Maintenance $20,000.00Valuation: 2213 - 2215 W Olive: Remove concrete from 2nd floor landing..., replace wood and water proof landing in 2...
Last Modified: 10/06/2025
Section 9-3-208(B) establishes the following base ambient levels for three different land-use
Last Modified: 07/22/2024
(standard, ADA-accessible, bicycle, etc.) based on the standards for different land
Last Modified: 03/29/2021
(standard, ADA- accessible, bicycle, etc.) based on the standards for different land
Last Modified: 01/26/2022
Last Modified: 06/08/2026
Remove (e) land & stair at side door, w/new concrete landing, steps & walk to connect...2025 Repair & Maintenance Issued Date:Permit...
Last Modified: 05/01/2025
(CRC R308.4.6) GLAZING ADJACENT TO THE STAIRWAY BOTTOM LANDING WHERE THE GLAZING...IS LESS THAN 36" ABOVE THE LANDING AND WITHIN 60" HORIZONTAL...
Last Modified: 03/11/2026
Land Use Types 1.3....User Changes to Default Data Screen Justification Land Use Land Uses...
Last Modified: 01/07/2025
Pedestrian connections provide access from land uses to transit connections....0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561...
Last Modified: 07/09/2021
46 '-1 1" 8'- 0" 8'- 10 " 13 '-0 " 13 '-0 " 4'- 0" LA ND IN G 4'-0" LANDING...MATCH EXT'G SFD NEW WINDOW (SEE SCHEDULE) NEW DOOR (SEE SCHEDULE) NEW CONCRETE...
Last Modified: 06/16/2025
Last Modified: 07/15/2025
Showing 861 to 880 of 1,398 entries.