Search Results

Showing results for "dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Pengadaan Erosion Control Mat Terpercaya Cilegon Banten.
Search Results

Attachment 1-V3-SP-IMcomments.pdf

with a minimum width of 15 feet, and not part of the shared driveway, and under control

Last Modified: 01/27/2022

Exhibit B.pdf

with a minimum width of 15 feet, and not part of the shared driveway, and under control

Last Modified: 01/27/2022

Departments

List of departments for the City of Burbank.

Last Modified: 10/01/2026

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 12/12/2024

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/20/2023

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/04/2025

20230630-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/10/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/10/2023

FY 2024-25 Adopted Fee Schedule

Barricades $33.00 Each Per Day (3) Delineator $33.00 Each Per Day (4) Small Traffic Control...Sign $33.00 Each Per Day (5) Large Traffic Control...

Last Modified: 06/27/2024

20231005-FY-23-24-Fee-Schedule_Final.pdf

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Barricades $32.00 Each Per Day (3) Delineator $32.00 Each Per Day (4) Small Traffic Control...Sign $32.00 Each Per Day (5) Large Traffic Control...

Last Modified: 09/01/2023

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

Barricades $5.50 Each Per Day (3) Delineator $4.50 Each Per Day (4) Small Traffic Control...Sign $8.75 Each Per Day (5) Large Traffic Control...

Last Modified: 06/20/2022

2025 OCT ISSUED

$90,000.00Valuation: UPDATES TO ELECTRICAL INFRASTRUCTURE TO SUPPORT VIRTUAL RAMP CONTROL...$5,000.00Valuation: USE EXISTING 120V CIRCUITS TO POWER (5) 500VA TRANSFORMERS...

Last Modified: 11/03/2025

Attachment 7 – EIR Addendum.pdf

system to accommodate runoff volume and implementation of mitigation measures to control...same activities would decrease since the regulatory standards and technology ...

Last Modified: 01/18/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet