Search Results

Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara.
Search Results

Updated_Objective_Standards_Consistency_Matrix (1).pdf

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 05/14/2024

CIP Updates Completed Projects

Date Construction Completion Date   Project Project Number Project Manager Scope...Project...

Last Modified: 03/03/2025

Planning Comments - Final Objective Standard Review

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 05/06/2024

CIP Updates New Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

ApxE_Updated Geotechnical Investigation.pdf

If the California Green Building Code requirements apply to this project, the vapor...As an alternative to the clean aggregate suggested in the...

Last Modified: 07/09/2021

CIP Updates Continued Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

ATTACHMENT 14_reduced size.pdf

All construction projects must comply with requirements in CAL Green and the California...Sustainability and Green...

Last Modified: 09/16/2022

2022_PLanning _ 830 E SanJose PLans Recommended Project Plans.pdf

20089A0.1 Cover sheet A0 plans 20089A0.2 Cover sheet A0 20089A2.1 Floor Plan A2 20089A2.2 Floor Plan A2 20089A2.3 Floor Plan A2 20089A3.1 Elevations A3 20089A3.2 Elevations A3 plans ...

Last Modified: 02/17/2022

20210101_Fiscal Year 2018-2019 Consolidated Plan Annual Performance Evaluation Report.pdf

residential services on energy and water efficiency  Implement California Green...Business Improvement Districts (Property and Tourism)  Expand the growth of...

Last Modified: 05/20/2021

2025-2029 CON PLAN DRAFT.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/21/2025

Attachment 2 – 2025-2029 Consolidated Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – Annual Action Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – 2025-2029 Consolidated Plan.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/02/2025

CON PLAN FINAL.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/18/2025

CON PLAN FINAL (1).pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/17/2025

Economic Development Dept_2022-23_Annual_Report_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 10/16/2023

econdev_2022-23_annual_rpt_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 01/25/2024

526 S Sunset Cyn Dr - Decision Letter

TITLE: Project No. 23-0005188 – Hillside Development Permit PROJECT ADDRESS:...The project had been previously...

Last Modified: 02/16/2024

840 E Verdugo - Plans

HEIGHT, WITH GREEN BOARD OR TWO LAYERS OF 15 LBS MOISTURE BARRIER W/ MTL....USE 5/8" GYPSUM GREEN BOARD IN @ WET (TUB/SHOWER, 3....USE 5/8" GYPSUM...

Last Modified: 08/18/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet