Search Results

Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara.
Search Results

CDD 06.10.2025 - SR - CDD CDBG Consolidated Plan AOI and Sub. Agreement FINAL

However, funding for the HSC project has not yet been fully secured....either project....The proposed transfer of funds from the HSC...

Last Modified: 05/29/2025

Ordinance_No._25-4024_.pdf

PROJECT FEATURES....MULTIPLE FAMILY RESIDENTIAL PROJECTS AND CERTAIN NON- RESIDENTIAL PROJECTS....All...

Last Modified: 05/21/2025

Ordinance_No._25-4024_ (1).pdf

PROJECT FEATURES....MULTIPLE FAMILY RESIDENTIAL PROJECTS AND CERTAIN NON- RESIDENTIAL PROJECTS....All...

Last Modified: 05/21/2025

Appendix K_Trip Generation.pdf

Appendix K Trip Generation In% Out% In% Out% 56% 44% 51% 49% TABLE 1: PROJECT...In Out Total In Out Total PROPOSED PROJECT Hotel [a]...

Last Modified: 12/13/2024

20210101_2805_N_Myers_PNOED.pdf

No. 20-0004943 (Single-Family Special Development Permit) Project Title 2805...Project Description Peter Kwon ...

Last Modified: 04/13/2021

3301 Haven Way View Study - final draft

EXHIBIT A EXHIBIT A: VIEW STUDY FOR HILLSIDE DEVELOPMENT PROJECT NO. 22-0002460...The Project also proposes full demolition of the existing roof...

Last Modified: 06/16/2025

Attachment 1 – Ordinance and Second Amendment to Development Agreement.pdf

(PROJECT NO. 23-0001343) City Attorney Synopsis This Ordinance approves the...(“Project”)....new parcels within the...

Last Modified: 01/18/2024

Updated_Preliminary_Hydrology_Report.pdf

Location The project site is located on 910 S Mariposa Street in the city of...Figure 1 below illustrates an aerial perspective of the project...

Last Modified: 10/29/2024

Updated_Preliminary_Hydrology_Report (1).pdf

Location The project site is located on 910 S Mariposa Street in the city of...Figure 1 below illustrates an aerial perspective of the project...

Last Modified: 10/29/2024

Preliminary_Hydrology_Report_second page

Location The project site is located on 910 S Mariposa Street in the city of...Figure 1 below illustrates an aerial perspective of the project...

Last Modified: 05/14/2024

Preliminary_Hydrology_Report.pdf

Location The project site is located on 910 S Mariposa Street in the city of...Figure 1 below illustrates an aerial perspective of the project...

Last Modified: 01/11/2024

Transportation Agency Awards $500 Million to Support Transit and Intercity Rail

$107 Million Goes to Metrolink Antelope Valley Double Track Project BURBANK...This will be combined with Measure M funding to complete the...

Sign Template for plan checks-edits

SINGLE FAMILY DEVELOPMENT PROJECTS IN R-1 & R-1-H ZONES PUBLIC NOTICE SIGN REQUIREMENTS...Location: Front of project site facing the...

Last Modified: 03/03/2026

2_Notice of FONSI and RROF for Village at Fairview_FINAL.pdf

known as The Village at Fairview Project for the purpose of the project to provide...The total estimated project cost is...

Last Modified: 01/07/2025

20210101_1258_E_Elmwood_PNOED.pdf

No. 20-0005487) Project Title 1258 E....Elmwood Ave., Burbank, CA 91501 Project Location (Address) The Project...

Last Modified: 04/13/2021

20210101_3209_N_Castleman_Lane_PNOED.pdf

No. 18-0006873 (Hillside Development Permit) Project Title 3209 Castleman...Lane Project Location (Address) The applicant proposes to...

Last Modified: 04/13/2021

Attachment 3 - SB 35 NOI Completeness Letter

- Notice of Intent (NOI) to Submit Application (Project No. 23-0002533) Dear...located at 910 South Mariposa Street (Project)....The...

Last Modified: 11/19/2024

Attachment 3 - SB 35 NOI Completeness Letter.pdf

- Notice of Intent (NOI) to Submit Application (Project No. 23-0002533) Dear...located at 910 South Mariposa Street (Project)....The...

Last Modified: 11/21/2024

Attachment 2 - Redlined Ordinance.pdf

(Project No. 23-0001259) City Attorney’s Synopsis This Ordinance amends Title...AB 2011 allows streamlined, ministerial review process for housing...

Last Modified: 05/04/2023

Attachment 2 – Application Form.pdf

Is there a relationship to a larger project or series of projects?...If the project involves demolition and new...

Last Modified: 01/18/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet