Showing results for "dWA 0821 1305 0400 Jasa Pemborong Hydroseeding Land Scaping Hijau Bangli Bali"
SHOW ON PLANS THAT THE ENTRY/EXIT DOOR MUST OPEN OVER A LANDING NOT MORE THAN 1.5...EXCEPTION: PROVIDING THE DOOR DOES NOT SWING OVER THE...
Last Modified: 05/06/2026
of how matching requirements were satisfied, as well as how any publicly owned land...use controls, tax policies affecting land, zoning...
Last Modified: 09/06/2024
Funds received during the year $624,548.26 included: •Interest = $551,5693.28 •Land
Last Modified: 12/16/2024
Funds received during the year $624,548.26 included: •nterest = $551,563.28 •Land
Last Modified: 02/14/2025
Show all site stairs, treads, risers, handrails, guardrails, and landings and retaining
Last Modified: 11/19/2024
Funds received during the year $538,622.55 included: •Interest = $537,361.30 •Land
Last Modified: 12/17/2025
Plan The proposed designation is consistent with Policy 3.10 of the Burbank2035 Land
Last Modified: 01/29/2026
Last Modified: 02/02/2026
site is zoned M-2 (General Industrial) with a Regional Commercial General Plan Land
Last Modified: 10/20/2022
Last Modified: 10/27/2022
•Land
Last Modified: 12/06/2023
Remove (e) land & stair at side door, w/new concrete landing, steps & walk to connect...2025 Repair & Maintenance Issued Date:Permit...
Last Modified: 05/01/2025
Land, Water & Development Company....Sidewalk/Parkway Zones Based on Land Use Context Land Use Context...
Last Modified: 02/08/2021
Land, Water & Development Company....Sidewalk/Parkway Zones Based on Land Use Context Land Use Context ...
Showing 881 to 900 of 1,524 entries.