Search Results

Showing results for "dWA 0821 1305 0400 Penyewaan Niton XRF Gold Analyzer Waropen Papua"

No results were found that matched the keywords: dWA 0821 1305 0400 Penyewaan Niton XRF Gold Analyzer Waropen Papua.
Search Results

Treasurer's Report November 2018.pdf

CC 12/27/2017 3,000,000.00 2.440 06/27/2022 3,000,000.00 1643 3,000,000.00 2.440 1305

Last Modified: 03/09/2021

FY 2024-25 Adopted CIP_Final

As the City's first "green" building with LEED Gold certification, the interior...N/A PROJECT DESCRIPTION AND JUSTIFICATION This project will collect data and...

Last Modified: 09/05/2024

02192013_Burbank_Greenhouse_Gas_Reduction_Plan.pdf

consistent with State CEQA Guidelines Section 15183.5, which allows  jurisdictions  to  analyze...Fluorescent Light (CFL) distribution   Made in the Shade tree planting  ...

Exhibit D.pdf

standards will not land uses that are no more intense than the buildout scenario analyzed...information and documentation deemed necessary by the Director for the purpose...

Last Modified: 01/27/2022

20211202-FY-2021-22-ADOPTED-CIP.pdf

A DMS system provides the necessary advanced applications that continuously analyze...The Revenue Protection module analyzes the existing meter...

Last Modified: 12/02/2021

Attachment 7 - Burbank_DraftNexusReport_4.29.22 Draft Updated_v2.pdf

It does not analyze specific projects “in the pipeline” at the local level, as such

Last Modified: 05/26/2022

20260422-DIFA7-001

It does not analyze specific projects “in the pipeline” at the local level, as such

Last Modified: 04/23/2026

BFFCOU.pdf

Fire Authority, Pasadena, Riverside City, Santa Ana, Santa Monica and Torrance is analyzed

Last Modified: 01/20/2021

20201210.AdoptedBudget20_21.pdf

Analyzing the impact of CalPERS investment returns specifically to Burbank, the...The cash flows for all four funds were analyzed, and while some...

Last Modified: 12/10/2020

Burbank 25-26 CIP PDF Final

$125,000 - - - - - $375,000 Project Description This project will collect data and analyze...information system and the Advanced Metering Infrastructure (AMI) meter data ...

Last Modified: 09/11/2025

Source Area Removal SVE Design Drawings 1

KNOCKOUT TANK LSW LEVEL SWITCH NAPL NON-AQUEOUS PHASE LIQUIDS OVA ORGANIC VAPOR ANALYZER

Last Modified: 03/18/2025

BFF-COU MOU (2021-22 to 2023-24)

County Fire Authority, Pasadena, Riverside City, Santa Monica, and Torrance is analyzed

Last Modified: 03/02/2022

BFF-COU - 2024-2027 Final, fully signed.pdf

County Fire Authority, Pasadena, Riverside City, Santa Monica, and Torrance is analyzed

Last Modified: 09/23/2024

20220901-FY-2022-23-Adopted-CIP

replacement costs of City equipment are reviewed and the health of each overall fund is analyzed...A DMS system provides the necessary advanced applications that...

Last Modified: 09/01/2022

801 South Sixth Street_SB 35 Decision Letter_FINAL 2

The SCA shall analyze how the proposed project will impact wastewater flows and...anyon Crk Spin g C a n yon C rk Place r ita Crk Stream St re am ...

Last Modified: 09/10/2025

801 South Sixth Street_SB 35 Decision Letter_FINAL2

The SCA shall analyze how the proposed project will impact wastewater flows and...anyon Crk Spin g C a n yon C rk Place r ita Crk Stream St re am ...

Last Modified: 02/25/2026

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 12/26/2023

777 N. Front St. - Final EIR Appendices.pdf

with the maximum incremental cancer risk established by the SCAQMD for projects analyzed

Last Modified: 03/31/2021

20201217-Bicycle-Master-Plan-001.pdf

This section analyzes the consistency of the City of Burbank Bicycle Master Plan

Last Modified: 12/17/2020

20210204-Bicycle-Master-Plan-001.pdf

This section analyzes the consistency of the City of Burbank Bicycle Master Plan

Last Modified: 02/05/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet