Search Results

Showing results for "dWA 0821 1305 0400 Teknisi XRF Pmi Machine Near Me Gorontalo Gorontalo"

No results were found that matched the keywords: dWA 0821 1305 0400 Teknisi XRF Pmi Machine Near Me Gorontalo Gorontalo.
Search Results

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...1002 or 6-1- 1604 (A) BMC Overtime parking $89.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...CVC Straddling line of handicapped space $346.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...$149.00 6-1-1002 (D) BMC Overtime parking $89.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

FY 2024-24 Adopted Fee Schedule revised

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...CVC Gridlock 22518 CVC Ride share lot/commuter log 22521 CVC Vehicle parked...

Last Modified: 12/12/2024

FY 2024-25 Adopted Fee Schedule

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...CVC Gridlock 22518 CVC Ride share lot/commuter log 22521 CVC Vehicle parked...

Last Modified: 06/27/2024

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...CVC Straddling line of handicapped space $346.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

20210707-FY-21-22-Fee-Schedule-Rev-1.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...$149.00 6-1-1002 (D) BMC Overtime parking $89.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

1.3387 $1,089 52 Lumber Yard, Hardware or Gardening Sales 1000 SF 0.3971 $323 35 Machine...1002 or 6-1- 1604 (A) BMC Overtime parking $89.00 22521 CVC Vehicle parked...

Last Modified: 06/20/2022

2023092023-FY-23-24-Fee-Schedule-Final.pdf

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...$149.00 22518 CVC Ride share lot/commuter log $79.00 22521 CVC Vehicle parked...

Last Modified: 09/20/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...*3 22518 CVC Ride share lot/commuter log $79.00 22521 CVC Vehicle parked...

Last Modified: 10/05/2023

PROPOSED FY 2025-26 FEE SCHEDULE

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...Vehicle parked unattended, engine running 6-1-1005 (F)(1) BMC CVC Vehicle...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 08/07/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 09/05/2025

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...CVC Gridlock 22518 CVC Ride share lot/commuter log 22521 CVC Vehicle parked...

Last Modified: 09/04/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 09/17/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 12/12/2025

20250625 (3).fy25_26feescheduleadopted.pdf

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

1.3387 $2,735 52 Lumber Yard, Hardware, or Gardening Sales 1000 SF 0.3971 $811 35 Machine...22507.8(c)2 CVC Vehicle parked unattended, engine running CVC Vehicle parked...

Last Modified: 03/18/2026

FINAL-Burbank.CA.2801 Thornton Ave. Phase I

indicators that involve past or present spills, stains, releases, cleanups on or near...However, a large groundwater contamination issue exists in the area,...

Last Modified: 04/03/2025

Library: When It All Burns

while Thomas’s detailed descriptions of grueling brush-hacking sessions and near -constant

Last Modified: 09/04/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet