Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Ahli Interior Kamar 3x3 Apartemen Aston Bogor.
Search Results

Attachment C - Objective Standards Consistency Matrix.pdf

any required front or street side yard, but may be permitted within the required interior...not occupy more than one-third (1/3) the area of the roof, are located in the...

Last Modified: 05/08/2023

Attachment C - Objective Standards Consistency Matrix.pdf 1

any required front or street side yard, but may be permitted within the required interior...not occupy more than one-third (1/3) the area of the roof, are located in the...

Last Modified: 06/26/2023

October 4th staff report (1).pdf

MAINTENANCE a) Perform all interior Facility maintenance, repairs and replacements...b) Ensure daily trash removal from all interior areas of the...

Last Modified: 09/22/2023

20260630-FY-26-27-Adopted-Fee-Schedule

$208.14 Each (b) Major (> 200 SF) $416.27 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $213.98 Each Unit (14) Partition (a) Commercial,...

Last Modified: 06/29/2026

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 03/17/2026

20260814-FY-26-27-Adopted-Revised

SF or portion thereof Each permit (24) Siding (a) Stone and Brick Veneer (interior...137 Description Amount Unit/Time (5) (6) Close Existing Openings (a)...

Last Modified: 08/17/2026

FY 2026-27 Adopted Fee Schedule

SF or portion thereof Each permit (24) Siding (a) Stone and Brick Veneer (interior...137 Description Amount Unit/Time (5) (6) Close Existing Openings (a)...

Last Modified: 09/22/2026

2026.06.22 Def-Resp. City of Burbank -Cross-Complaint w exhs.

CUL-2: A Qualified Archeologist, meeting the Secretary of the Interior’s Standards...Department of the Interior, National Park Service, National...

Last Modified: 06/26/2026

Appendix F_HazMat Studies_Part 1.pdf

• Partner observed approximately 5% of all interior units and all common areas...Additionally, no other potential PCB-containing equipment...

Last Modified: 12/13/2024

20210301_AppendixAISNOPandComments_Avion.pdf

to the top of the parapet and would include large truck dock yards to allow for interior...Interior circulation also includes access and...

Last Modified: 03/31/2021

910 S Mariposa SR - final.pdf

area located at the rear of the site and a seating area located within the site’s interior

Last Modified: 11/21/2024

910 S Mariposa SR - final

area located at the rear of the site and a seating area located within the site’s interior

Last Modified: 11/19/2024

Winter Events 2025

Burbank Tenant Protection Urgency Ordinance

Last Modified: 11/20/2025

HOO_SaferReturnWorkCommunity July 30 2021.pdf

Alone in a separate room, office or interior space; f) Special considerations are

Last Modified: 08/02/2021

City Council Meeting Guide

Last Modified: 09/29/2026

Shelter in Place

Learn when and how to shelter in place during severe weather or hazardous materials incidents in Burbank, and sign up for emergency alerts to stay safe.

Last Modified: 09/11/2026

420 S. Sunset Cny - Project Plans - 4-19-23.pdf

REAR PATIO AT FIRST FLOOR FIRST FLOOR SET BACK36'-0" 2'-10" 2'-10" 3-CAR GARAGE INTERIOR...REAR PATIO AT FIRST FLOOR FIRST FLOOR SET BACK36'-0" 2'-10" 2'-10" 3-CAR GARAGE...

Last Modified: 10/23/2023

Pickwick Amended Tentative Map and Plans.pdf

INTERIOR SIDE YARD SETBACK: 5' MIN. 5' MIN....Interior Side Yard Setback: 5' Min. Street-facing Side Yard Setback: 25' Min.

Last Modified: 10/14/2022

Burbank GGRP CEQA_3.9.2022_CLEAN.pdf

training shall be conducted by an archaeologist who meets or exceeds the Secretary of Interior...overall shape of the building, its materials, craftsmanship, decorative...

Last Modified: 03/09/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet