Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Harga Pemasangan Kitchen Set Warna Sage Wilayah Logios Depok"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Harga Pemasangan Kitchen Set Warna Sage Wilayah Logios Depok.
Search Results

20210101_608_N_Bel_Aire_ProjectPlans.pdf

REQ'D SETBACK FOR PROPERTY: 35.5' PROPOSED SET BACK : 35'-10" >35'-6" OK (N...-KITCHEN FAN TO BE 100 CFM ,3 SONE MAX...."X 70 " (E ) W IN...

Last Modified: 04/13/2021

2026 JAN FINALED

REMODEL FRONT PORCH, 1ST REMODEL: KITCHEN, FAMILY ROOM 724 SF, ROOF ALTERATION....REMODELED KITCHEN, (E) BATHROOM, LIVING ROOM, & OFFICE NOT...

Last Modified: 02/06/2026

2025 MAY FINALED

C/O KITCHEN & BATHROOM SINKS AND 1 TOILET....EIGHT LIGHT FIXTURES, 12 OUTLETS, KITCHEN HOOD....remodel ((1) kitchen hood;...

Last Modified: 06/05/2025

2025 JAN FINALED

and Alteration 01/31/2025Permit Final Final Date:Permit Status: NON STRUCTURAL KITCHEN...INCLUDES 26 ELECTRICAL OUTLETS AND 27 FIXTURES, 1...

Last Modified: 02/04/2025

2814 Empire Plans.pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/20/2022

Attachment 4..pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/27/2022

2025 DEC FINALED

Status: Replace panel & add 20 light fixtures: 4 @ ea/bedroom, 9 living rm & 3 at kitchen...Final Date:Permit Status: SFD: 642 SF ADDITION, NEW MASTER BEDROOM, RE-LOCATED...

Last Modified: 01/02/2026

20230622_BHC-PlanningDevelopmentResubmittal_compressed.pdf

SPACE PER UNIT: (NOT REQ'D IN MDC-2 & MDM-1 ZONE) LANDSCAPING (R4-ZONE) (INCLUDES SET...6 " 1 0 ' - 8 " 3 3 ' - 5 " 12' - 6 3/4" 7' - 7" 20' - 1 3/4" 112 SF ...

Last Modified: 07/25/2023

20210101_2814_W_Empire_Ave_NOI_Final.pdf

Power fees for providing electric service are Aid-in-Construction (AIC) charges set...LIVINGBEDROOM BATH KITCHEN 2 4 '- 3 " 19'-6" LIVING...

Last Modified: 08/30/2021

Att2 - Summary of Proposed Changes

Commercial kitchens are high-volume water users....Single- pass cooling systems have historically been used in commercial settings...is to...

Last Modified: 06/18/2026

2025 JUN FINALED

12/2025Permit Final Final Date:Permit Status: UNIT B- NON-STRUCTURAL REMODEL OF KITCHEN...Remodel includes (2) closets, (N) kitchen pantry,...

Last Modified: 07/01/2025

2025 AUG FINALED

11/2025Permit Final Final Date:Permit Status: UNIT H- NON-STRUCTURAL REMODEL OF KITCHEN...:Permit Status: 970 sf 2nd floor addition, 77 sf 1st floor addition and 200 sf...

Last Modified: 09/02/2025

1048 Sherlock Dr - (4-16-25)

THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...THE HEATER THAT ALLOWS SHUTTING OFF THE HEATER WITHOUT ADJUSTING THE THERMOSTAT...

Last Modified: 06/23/2025

2021_Planning_231 N. Niagara Plans 7.1.2021.pdf

BMC 10-1-603(E)(2)(A) AT LEAST 40 PERCENT OF THE LENGTH OF THE SECOND STORY IS SET...A301 FAR 1ST FLOOR: 1279.00 SF ± 20' - 3" 2' - 0" 241 SF LIVING 7 514 SF ...

Last Modified: 07/07/2021

420 S Sunset Canyon Dr_HDP-Decision Letter

officers, employees agencies, boards, commissions, or City Council to attack, set...| Woolueae S2 COUNTER SPACE IN KITCHEN SHALL HAVE A MAXIMUM...

Last Modified: 08/03/2026

2025 FEB ISSUED

REPLACE AND REROUTE KITCHEN GAS LINE THROUGH THE ATTIC W/15 FT BLACK PIPE 1"....HOLT AVE #3 Raz Grimbaum 8184481355 91367CAWoodland Hills Applicant 6167 Le...

Last Modified: 03/10/2025

2026 MAR FINALED

2026Permit Final Final Date:Permit Status: 800 SF INTERIOR REMODEL TO INCLUDE: KITCHEN..., LIVING AND 2 BATHROOMS; NEW WINDOW IN KITCHEN, REPLACE...

Last Modified: 04/03/2026

20251126-24-25_DIF_Annual_Report-001.pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....The kitchen requires commercial- level quality and equipment to...

Last Modified: 11/26/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet