Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Interior Set Kamar Kayu Jati Grand Lotus Residence Depok"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Interior Set Kamar Kayu Jati Grand Lotus Residence Depok.
Search Results

Attachment 1 – Draft Firearm Retail Activity Use Regulations (1) (1).pdf

property lines in accordance with measuring separation distance requirements as set...property lines in accordance with measuring separation distance requirements as...

Last Modified: 03/11/2024

Attachment 1 – Draft Firearm Retail Activity Use Regulations (1) (2).pdf

property lines in accordance with measuring separation distance requirements as set...property lines in accordance with measuring separation distance requirements as...

Last Modified: 03/11/2024

25-4,034 Adopting by Reference 2025 CA Building Standards Code

person shall have the authority to address the concerns of neighboring property residents...other uses requires additional safeguards to protect life and property of the...

Last Modified: 11/24/2025

DEIR Appendix K (LaTerra).pdf

Residential courtyards and balconies would be on the interior sides of the buildings...I 2611 ~ i 27 : I 281, II I. II accumulate by...

Last Modified: 05/04/2021

20220316-Rancho-Providencia-Neighborhood-Protection-Plan-1998-002.pdf

existing traffic and parking conditions within the study area, and to develop a set...Jccommodates four, full-size parking spaces (two 20-foot end spaces and two 22-foot ...

Last Modified: 04/23/2026

SR - 1521 E. Alameda Ave.pdf

of measuring height, the proposed home would be required to have a split-level interior...height of the lot does not allow the proposed home to exceed the height...

Last Modified: 02/17/2023

PROPOSED FY 2025-26 FEE SCHEDULE

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 08/07/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/12/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/05/2025

20250625 (3).fy25_26feescheduleadopted.pdf

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 12/18/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 09/17/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a) Interior...Each (13) Manufactured House $208.35 Each Unit (14) Partition (a) Commercial,...

Last Modified: 03/18/2026

2026.06.22 Def-Resp. City of Burbank -Cross-Complaint w exhs.

CUL-2: A Qualified Archeologist, meeting the Secretary of the Interior’s Standards...Department of the Interior, National Park Service, National...

Last Modified: 06/26/2026

1821 N Bel Aire Dr_Planning Approved Plans

'-7 " 3' -0 " 18 '-0 " 2' -8 " 48'-1 1/2" PROPOSED COVERD PATIO (E) RESIDENCE...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS...

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

'-7 " 3' -0 " 18 '-0 " 2' -8 " 48'-1 1/2" PROPOSED COVERD PATIO (E) RESIDENCE...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS...

Last Modified: 05/06/2026

Resolution_No._22-29291.pdf

responsible guardian or person who has acted in that capacity, regardless of place of residence...A Cafeteria Plan as set forth in Resolution No....

Last Modified: 02/07/2022

STANDARD PLAN FORMATTING 2022.pdf

and that all documents, photographs, and plans conform to City requirements as set...DOCUMENTS:  One standard sized and one reduced hard-copy of each...

Last Modified: 05/18/2022

City of Burbank Economic Recovery Plan.pdf

New Rent Repayment Ordinance setting a date certain for the repayment of rents to...Disinfected fixed-route vehicles daily and wiped down interiors...

Last Modified: 03/29/2021

2020-burbank-economic-recovery-plan-001.pdf

New Rent Repayment Ordinance setting a date certain for the repayment of rents to...Disinfected fixed-route vehicles daily and wiped down interiors...

Last Modified: 03/29/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet