Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Interior Set Kamar Kayu Jati Grand Lotus Residence Depok"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Interior Set Kamar Kayu Jati Grand Lotus Residence Depok.
Search Results

SAS_Bill_of_Rights_Spanish_compressed.pdf

Violación, Abuso e Incesto (RAINN) – La organización contra la violencia sexual más grande...Violación, Abuso e Incesto (RAINN) – La organización contra la violencia...

Last Modified: 09/04/2025

Heat Advisory & Safety Reminders

temperatures continue to rise through this weekend, the City of Burbank encourages residents...temperatures continue to rise through this weekend, the City of Burbank...

Last Modified: 07/23/2026

Attachment 6 - Culver City Firearms and Ammunition Retail Establishments.pdf

without complying with all applicable requirements of the City's Zoning Code as set...Applicant and the Applicant's employees, agents, and/or supervisors, if any, as...

Last Modified: 05/25/2023

Ordinance - 24-4,010 (SB 9)

“Specific Adverse Impact” shall have the same meaning as set forth in California...First Floor Minimum Setbacks (Street-facing side, Interior side...

Last Modified: 04/11/2024

24-4,010 SB 9

“Specific Adverse Impact” shall have the same meaning as set forth in California...First Floor Minimum Setbacks (Street-facing side, Interior side...

Last Modified: 03/07/2024

Attachment 1 – Ordinance.pdf

All the findings set forth above are true and correct and are incorporated herein...First Floor Minimum Setbacks (Street-facing side, Interior...

Last Modified: 02/01/2024

Attachment 1 – Ordinance (1).pdf

All the findings set forth above are true and correct and are incorporated herein...First Floor Minimum Setbacks (Street-facing side, Interior...

Last Modified: 02/01/2024

Planning Comments - Final Objective Standard Review

to a maximum height of nine (9) feet, a maximum of six (6) feet, and a maximum interior...required front or street side yard, but may be permitted within the required...

Last Modified: 05/06/2024

Planning_Attachments A-K_3000 Empire Ave.pdf

and subdivision standards if the development is consistent with the standards set...abutting or adjacent to R-3 or R-4 zones, above- grade parking structures must be...

Last Modified: 01/07/2022

2025 APR ISSUED

MONICA BLVD #747 Victor Fressie 6267352873 90015CALOS ANGELES Applicant 1111 GRAND...NEW LOCATIONS FOR PLUMBING FIXTURES. -- SUBJECT TO FIELD VERIFICATION -- ...

Last Modified: 05/01/2025

2026 JUL FINALED

2026PC Assigned Final Date:Permit Status: Term 2 - deferred submittal-(BS2400265) Interior...2026Permit Final Final Date:Permit Status: NEW 3386.1 SF ONE-STORY SINGLE...

Last Modified: 08/10/2026

Heat Advisory & Safety Reminders

As temperatures are expected to rise this week, the City of Burbank encourages residents...As temperatures are expected to rise this week, the City of Burbank encourages...

Last Modified: 03/16/2026

330 N San Fernando Blvd_CUP_Public Notice Letter_Final

under CEQA Guidelines Section 15301(a) (Existing Facilities) for the proposed interior...This notice was mailed to all residents and property...

Last Modified: 09/28/2026

2025 MAY FINALED

FULL HOUSE INTERIOR REMODEL....2025Permit Final Final Date:Permit Status: Addition of 499 sq. ft. to the existing residence...Alteration ...

Last Modified: 06/05/2025

12092023-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

Initial Opening Operations Early Opening The grand opening impacted travel on...The initial grand opening traffic volumes subsided from Summer...

Last Modified: 12/08/2023

Attachment 6 (Reduced Size) – Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program.pdf

Initial Opening Operations Early Opening The grand opening impacted travel on...The initial grand opening traffic volumes subsided from Summer...

Last Modified: 11/22/2023

20260505-Rancho Providencia Neighborhood Protection Plan Update Mitigated Negative Declaration-001.pdf

Initial Opening Operations Early Opening The grand opening impacted travel on...The initial grand opening traffic volumes subsided from Summer...

Last Modified: 05/05/2026

East Olive Reconfiguration Restriping Project Scheduled for March 17–20, 2025

The City of Burbank is set to begin the East Olive Reconfiguration Restriping...BURBANK, CA [March 11, 2025] – The City of Burbank is...

Last Modified: 03/11/2025

7-13-21 BCC - 2. Sustainable Burbank Commission_Redacted.pdf

, 2-1-406, 2-1-407) I Agree Elliot A Gannon OBJECTIVE Transition from on-set...engagement and outreach in the development of So-Fi Stadium, Metro's Regional...

Last Modified: 06/17/2021

Final Statement FY 2025.pdf

$214,599.60 Grand Total: $1,072,998.00 Date: 6/11/2025 Publish: TBD

Last Modified: 04/15/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet