Showing results for "dWA 0852 2611 9277 [[GLORION]] Interior Set Kamar Kayu Jati Grand Lotus Residence Depok"
This notice was mailed to all residents and property owners within 1,000 feet of...: www.burbankca.gov/pendingprojects Please contact the project planner to...
Last Modified: 04/12/2024
The AUP process requires that this notice be mailed to all residents and property...at: www.burbankca.gov/pendingprojects Please contact the project planner to...
Last Modified: 06/05/2024
This notice was mailed to all residents and property owners within 1,000 feet of..., at 818-238-5250 E-mail the project planner at: [email protected] ...
Last Modified: 05/30/2024
Last Modified: 10/26/2023
developed by the UCLA Department of Geography and supported by the UCLA Sustainable LA Grand...overall shape of the building, its materials, craftsmanship, decorative...
Last Modified: 04/21/2022
Initial Opening Operations Early Opening The grand opening impacted travel on...The initial grand opening traffic volumes subsided from Summer...
Last Modified: 11/22/2023
Last Modified: 12/08/2023
Last Modified: 05/05/2026
Three sets of project plans (11” x 17” or comparable size) including site plan and...the matter is scheduled for a public hearing at the Planning Board (additional...
Last Modified: 06/02/2021
Last Modified: 03/29/2021
• Two sets of signed and stamped hydrology calculations....• Two sets of signed and stamped hydraulic calculations....pool discharges • Decorative...
Last Modified: 04/13/2021
Step Four: The City Council, upon receipt of the recommendation, will set the matter...shall adopt a resolution stating its recommendation, focusing on the criteria...
Last Modified: 04/12/2021
Step Four: The City Council, upon receipt of the recommendation, will set the matter...The Director may set deadlines for submittal of applications...
The City will ensure public outreach is conducted to both residents as well as the...department’s new capital improvements needed to serve both existing and future...
Last Modified: 05/26/2022
Last Modified: 04/23/2026
2026PC Assigned Final Date:Permit Status: Term 2 - deferred submittal-(BS2400265) Interior...2026Permit Final Final Date:Permit Status: NEW 3386.1 SF ONE-STORY SINGLE...
Last Modified: 08/10/2026
Last Modified: 08/12/2026
Surrounding Land Uses and Setting: The proposed city-wide Plan outlines proposed...be required on a project level basis at the time when and in the environmental...
Last Modified: 02/05/2021
Burbank CA 91506 Mobile: Martyn Lawrence Bullard Design Project Manager Interior...Project scope included interior architecture for 124 guest...
Last Modified: 06/16/2022
Showing 521 to 540 of 3,837 entries.