Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Jasa Design Kitchen Set Aluminum Bandar Kemayoran Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Jasa Design Kitchen Set Aluminum Bandar Kemayoran Jakarta Pusat.
Search Results

2021_Planning_706 East Verdugo Ave - Plans.pdf

'-0") 7 8 9 8 8 PROPERTY LINE N 48° 47'32" W 149.85' AutoCAD SHX Text BID SET...THE DESIGNS AutoCAD SHX Text Burbank, CA 91502 AutoCAD SHX...

Last Modified: 09/07/2021

2021 N Parish Place - Decision Letter (final)

Refer to Attachment A for the approved set of plans....the building on each elevation, as measured from the portion of the elevation ...

Last Modified: 09/15/2025

20210101_Five Year (2020-2025) Analysis of Impediments to Fair Housing Choice.pdf

Any unit not developed with individual kitchens and bathrooms must have access to...common areas containing kitchen and bathroom...

Last Modified: 05/20/2021

All-Language-Cart-Stickers

whereitgoes.burbankca.gov NO PLASTIC BAG & WRAP FOAM TANGLERSBATTERIES METAL Cans, aluminum

Last Modified: 04/14/2026

3307 CASTLEMAN LN - Project Plans.pdf

' R = 425.00' Δ = 10°49'19" L = 80.27' CASTLEMAN LANE 2 8 ' LOT 10 SET...SET REBAR & CAP, "L.S. 8571" 2.00' O/S N'LY FROM PROP....

Last Modified: 07/14/2023

20220620-FY-22-23-Adopted-Fee-Schedule.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 06/20/2022

20230309-FY-22-23-Adopted-Fee-Schedule.pdf

Set $1.00 Set (6) (a) 11" x 17" Copies $0.75 Page (+.10 each additional copy)...Without Kitchen $65.00 1-3 Hours With ...

Last Modified: 03/09/2023

20210101_Planning_Historic_Application_Instructions.pdf

Step Four: The City Council, upon receipt of the recommendation, will set the matter...shall adopt a resolution stating its recommendation, focusing on the criteria...

Last Modified: 03/29/2021

FINAL Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident $81.00...

Last Modified: 01/05/2026

FINAL - Updated for changes FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident $81.00...

Last Modified: 03/17/2026

HDP SUPPLEMENTAL APP 04.12.2022 FINAL.pdf

specific types of remodels and additions to single family homes on properties in the designated...review the proposed project for code compliance and neighborhood...

Last Modified: 04/13/2022

20210101_Historic_Application.pdf

Step Four: The City Council, upon receipt of the recommendation, will set the matter...shall adopt a resolution stating its recommendation, focusing on the criteria...

Last Modified: 04/12/2021

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

Materials include cement board siding, aluminum composite panels in varied shades..., setting, materials, workmanship, feeling, and...

Last Modified: 12/13/2024

2025 MAY ISSUED

OF MECHANICAL AND PLUMBING DESIGNS FOR MODULES A & B....LA Builders & Design Group 8186327261 91411CAVan Nuys Contractor 15500 Erwin St...VENT...

Last Modified: 07/07/2025

2022 Grading Shoring Correction List

. • Sets must be complete..... • See the marked-up set of plans for additional corrections....Design and detail required...

Last Modified: 02/09/2026

20210101_1258_E_Elmwood_Decision.pdf

The house has been reviewed against the Neighborhood Compatibility provisions as set...where, each of the conditions have been addressed in the building permit plan...

Last Modified: 04/13/2021

Construction Set to Begin on Magnolia Boulevard Water Main Upgrade in January 2026

Starting in January 2026, Burbank Water and Power (BWP) will begin to replace the aging water pipeline along Magnolia Boulevard between Catalina Street and Varney Street. Burbank, CA...

Last Modified: 12/04/2025

Cover_Letter_from_Rand_Paster_Nelson_LLP (1).pdf

location, as depicted on page 7 and 10 of the revised architectural plans set and...are restated below with clarifications and updates to correspond to the revised...

Last Modified: 10/29/2024

Cover_Letter_from_Rand_Paster_Nelson_LLP (2).pdf

location, as depicted on page 7 and 10 of the revised architectural plans set and...are restated below with clarifications and updates to correspond to the revised...

Last Modified: 10/29/2024

SB 35.pdf

pursuant to this subdivision if the development is consistent with the standards set...For purposes of this clause, “project labor agreement” has the same meaning as...

Last Modified: 04/18/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet