Showing results for "dWA 0852 2611 9277 [[GLORION]] Jasa Design Kitchen Set Aluminum Bandar Kemayoran Jakarta Pusat"
PERPENDICULAR ACOUSTICAL AMERICANS WITH DISABILITIES ACT ADJUSTABLE ABOVE FINISH FLOOR ALUMINUM...PRIVATE OPEN SPACE PER UNIT: (NOT REQ'D IN MDC-2 ZONE) LANDSCAPING...
Last Modified: 02/12/2024
Planning – Full set of Plans (1 set of Civil /Landscape/Architectural/Structural...) b.Building & Safety – Full set of...
Last Modified: 06/23/2021
& BATHROOM, REMOVE A NON-LOAD BEARING WALL IN KITCHEN, REPLACE WATER HEATER AND...Single-Family Addition / Alteration 04/23/2025Permit Final Final Date:Permit Status: ...
Last Modified: 05/01/2025
: Project Number: Date: O W N E R : The drawings and specifications and designs...GFCI OUTLETS ARE REQUIRED: FOR ALL KITCHEN RECEPTACLES...
Last Modified: 06/30/2025
TYPICAL REINFORCEMENT DETAILS S-3 ALUMINUM NOTES: 1....ALL WORK SHALL CONFORM TO CONDITIONS SET BY THE PERMIT. 28....ALL WORK SHALL CONFORM TO...
Last Modified: 02/07/2025
Last Modified: 03/04/2025
Following the design guidelines for modulation, the house will feature different...0" FOYER COVERED PORCH FAMILY OFFICE FORMAL DINING COVERED PATIO ...
Last Modified: 06/07/2021
EXISTING DOOR SCHEDULE MARK HEIGHTWIDTH OPERATION FRAMING QUANTITY 7'-0"3'-6" ALUMINUM...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS...
Last Modified: 04/12/2024
Cont'd 3 Fire Station 11 Kitchen Modernization 24824 Anna Hartounian Comprehensive...modernization of existing 25-year-old kitchen: repair and...
Last Modified: 03/03/2025
development standards as required in Burbank Municipal Code Section 10-1-620.3 (Design...A link to Burbank Municipal Code Section 10-1-620.3...
Last Modified: 11/15/2024
Last Modified: 05/30/2024
ALUMINUM EGC EQUIPMENT GROUNDING CONDUCTOR EQUIPMENT GROUNDING CONDUCTOR NEC...TERMINATION OF ALUMINUM CONDUCTOR-USE A SUITABLE STRIPPING TOOL...
Last Modified: 11/14/2024
ACOUS ACOUSTICAL ADJ ADJUSTABLE A/C AIR CONDITIONING AL ALUMINUM...individuals (e.g., child-worn devices that sound when submerged or moved beyond a...
Last Modified: 12/08/2025
(R306.1 AND R306.2) ND A KITCHEN (R306.1 AND R306.2) D A KITCHEN (R306.1 AND R306.2...) 16 KITCHEN SINKS, LAVATORIES,...
Last Modified: 08/26/2021
PERPENDICULAR ACOUSTICAL AMERICANS WITH DISABILITIES ACT ADJUSTABLE ABOVE FINISH FLOOR ALUMINUM...SPACE PER UNIT: (NOT REQ'D IN MDC-2 & MDM-1 ZONE) LANDSCAPING (R4-ZONE)...
Last Modified: 07/25/2023
setback from street, swimming pool • Materials: Wood framed structure; wood or aluminum...Wood framed and steel structure; glass panes with steel dividers; wood, steel or...
Last Modified: 03/24/2021
to ensure the materials are being recycled, then it is preferable to wait to set...before they are completely cooled, soak them in water and place them in heavy-duty...
Last Modified: 06/17/2026
2026Permit Final Final Date:Permit Status: DEFERRED SUBMITTAL - INSTALLATION OF ALUMINUM...Kitchen remodel, close/replace windows within existing...
Last Modified: 07/01/2026
Accessible Housing and Universal Design 5....Is the public housing agency designated as troubled under 24 CFR part 902?...No Plan to remove...
Last Modified: 05/20/2021
Showing 81 to 100 of 3,479 entries.