Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat.
Search Results

2026-07 Treasurer's Report

3.05 880 US Treasury | No Limit 63,000,000 61,654,950 62,460,403 8.98 3.97 1,440 Total...Treasurer LAIF | Successor Agency LAIF | Housing Authority 600,000 ...

Last Modified: 09/03/2026

DEIR Appendix A (LaTerra).pdf

site to accommodate new construction of a mixed-use project that would include a total...Total parking provided is 1,462 spaces, which exceeds the...

Last Modified: 05/04/2021

2023-06 Treasurer's Report.pdf

weighted average yield of the portfolio at the end of the month is 3.13% and the total...| 90 % US Treasury | No Limit 30,000,000 28,272,870 29,142,438 5.11 3.48 782 ...

Last Modified: 08/01/2023

2023-06 Treasurer's Report (2).pdf

weighted average yield of the portfolio at the end of the month is 3.13% and the total...| 90 % US Treasury | No Limit 30,000,000 28,272,870 29,142,438 5.11 3.48 782 ...

Last Modified: 08/09/2023

23-4002 ADU JADUs

area above a staircase, over 12 feet in interior height, shall count towards the total...conjunction with an ADU, if said structure is covered, it shall count towards the...

Last Modified: 04/10/2024

2024 Annual Military Equipment Report

internal audit pertaining to violations of the military equipment use policy, the total...AIRCRAFT (DRONE) Unmanned, remotely piloted aircraft (drone) was utilized a...

Last Modified: 08/12/2025

2023 ANNUAL PLAN DRAFT (1).pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 03/17/2023

2023 ANNUAL PLAN DRAFT (2).pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 03/17/2023

2023 ANNUAL PLAN DRAFT (3).pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 03/17/2023

2023 ANNUAL PLAN DRAFT.pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 02/08/2023

2023 ANNUAL PLAN DRAFT.pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 02/08/2023

3. Civil Service Board_Redacted

Total Loss Adjuster, December 2016 to February 2018 Same responsibilities to current...Interpreted and presented total loss valuation settlements...

Last Modified: 06/13/2024

20210301_AppendixAISNOPandComments_Avion.pdf

101,230SF NOTE: *Square Footages are approximate and conceptual Area SF = Total...Based upon a total of 1,014,887 sf of creative industrial,...

Last Modified: 03/31/2021

20210301_AppendixINoiseTechReport_Avion.pdf

The proposed retail center component of the project would provide a total of 15,475...The proposed project includes six creative industrial buildings...

Last Modified: 03/31/2021

2021_Pickwick_Tentative_Map.pdf

CAR/SIDE BY SIDE GARAGE 12 UNITS - PLAN 3X - CORNER (ALT) CONDITION 96 UNITS - TOTAL...25 SPACES 25 SPACES ...

Last Modified: 11/23/2021

2931 Olney Pl Approved Plans.pdf

0" 25'-10" N PROPOSED EXPANSION OF TRELLIS/CANOPY 7'-6" 6'-0 " 3'- 0 " TOTAL...31.08' 19: 25.83' 20: 20.58' 21: 15.33' 22: 10.08' 23: 4.83' -------------------...

Last Modified: 04/05/2022

Rob Searcy - LALAX04397B_202101001_Wireless_SA.pdf

numerical and percentage requirements for each such claimed perimeter; (3) the total...attempted for each month both successfully and unsuccessfully completed; (4) the...

Last Modified: 04/26/2024

First Street Village

Last Modified: 06/01/2026

2931 Olney Place Plans.pdf

0" 25'-10" N PROPOSED EXPANSION OF TRELLIS/CANOPY 7'-6" 6'-0 " 3'- 0 " TOTAL...31.08' 19: 25.83' 20: 20.58' 21: 15.33' 22: 10.08' 23: 4.83' -------------------...

Last Modified: 01/31/2022

9.20.2023_3000 W Empire Ave_Status_Letter and Attachments.pdf

more than 10 residential units are proposed, at least 10 percent of the project's total...   ...

Last Modified: 10/02/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet