Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat.
Search Results

2019-11 Treasurer's Report.pdf

weighted average yield of the portfolio at the end of the month is 2.09% and the total...1.68 595 US Treasury | No Limit 16,000,000 16,051,210 15,951,933 3.56 1.93 657 ...

Last Modified: 03/09/2021

2024-08 Treasurer's Report (1)

2.25 816 US Treasury | No Limit 21,000,000 20,236,710 20,538,352 3.37 3.01 568 Total...LAIF | Successor Agency LAIF | Housing Authority 3,596,000 600,000...

Last Modified: 05/20/2026

Project Applicant's Submitted Consistency Matrix

Buildings with a total of 2 stories or less are exempt. iii....The Project is proposing to set aside 17% of the unit total for very...

Last Modified: 09/25/2025

Consistency Matrix - SB 35 NOI

Buildings with a total of 2 stories or less are exempt. iii....The Project is proposing to set aside 17% of the unit total for very...

Last Modified: 09/25/2025

SR - 921-1001 W. Riverside Dr V7.pdf

and/or upper-level decks for each unit (dwelling units are contained within a total...are arranged around a series of landscaped paseos and open spaces); • Of the...

Last Modified: 10/20/2022

2026 MAY FINALED

20 FT X 10FT MAX HEIGHT TENTS AND (8) 16 FT X16 FTX 10 FT MAX HEIGHT TENTS: (8) TOTAL...STORY GARAGE/STORAGE BUILDING WITH (N) 283 SF ADDITION TO CONVERT TO (N) 695 SF...

Last Modified: 06/15/2026

3700 RD_Proposed Architectural Plans.pdf

UNITS 49 UNITS 49 UNITS TOTAL AFFORDABLE UNITS 11% VERY LOW 4 UNITS*...80,582 SF 80,582 SF GROSS BUILDING AREA - TOTAL 82,723 SF...

Last Modified: 03/04/2022

Updated_Project_Plans.pdf

TOTAL BUILDING AREA MINUS PARKING => ±50,543.3 SQ.FT....TOTAL BUILDING AREA PLUS PARKING => ±70,513.8 SQ.FT. 910 S....LANDSCAPE =...

Last Modified: 10/29/2024

BPOA.pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 01/20/2021

BPOA MOU (2024-2027) - Final, signed.pdf

effectiveness: OVERTIME HOURS BASE LEVEL (July-Dec 1994) Total...The total employee contribution, including any cost...

Last Modified: 12/02/2024

Soils Report.pdf (1)

Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of Liq.Sus. -200 Est....Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of...

Last Modified: 06/23/2023

Soils Report.pdf

Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of Liq.Sus. -200 Est....Water (pcf): 62.4 Depth to Total Unit Water FIELD Depth of...

Last Modified: 02/08/2023

5-18-21 PH - Attachment 1.pdf

The total number of written protests against the rate increases for water and refuse

Last Modified: 05/06/2021

Attachment 1 - Resolution.pdf

The total number of written protests against the rate increases for water, refuse

Last Modified: 05/05/2022

SITE IMPROVEMENT APPLICATION

POOL: YES NO MULTI-FAMILY POOL: YES NO PUBLIC POOL: YES NO GRADING / SHORING TOTAL

Last Modified: 02/11/2026

ADU APPLICATION

MECHANICAL ELECTRICAL PLUMBING Please Indicate the Total Quantity in the Space Provided

Last Modified: 02/09/2026

Cover_Letter_From_Rand_Paster_Nelson_LLP.pdf

Attorney 1 Note that utilizing the maximum 50 percent density bonus would achieve a total

Last Modified: 01/11/2024

FY 24-25 CDBG Final Statement (1).pdf

$212,916.00 Grand Total: $1,120,760.00 Date: 6/26/2024 Publish: 7/3/2024

Last Modified: 04/15/2026

FY 24-25 CDBG Final Statement.pdf

$212,916.00 Grand Total: $1,120,760.00 Date: 6/26/2024 Publish: 7/

Last Modified: 10/03/2024

Burbank Red Tags Tin Horn Flats Building 3.31.21 Final .pdf

At this point the owner and their representatives have citations totaling $2,500

Last Modified: 04/14/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet