Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat.
Search Results

10032023-Appendix D_Turning Movement Counts Jan 2022-001.pdf

(PM) Totals (PM) 817 798 NORTHBOUND S Buena Vista St Totals (NOON) Totals (NOON...(PM) Totals...

Last Modified: 10/03/2023

10032023-Appendix D_Turning Movement Counts Jan 2022-001 (1).pdf

(NOON) Totals (NOON) 12:00 PM - 01:00 PM 933 663 585 Totals (AM) 789 Totals...(NOON) Totals...

Last Modified: 04/23/2026

20220901-FY-2022-23-Adopted-CIP

NON-BWP TOTALS BWP TOTALS BWP-WATER UTILITY TOTALS BWP-WATER UTILITY - (continued...Maintenance and Rehabilitation ...

Last Modified: 09/01/2022

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

NON-BWP TOTALS BWP TOTALS BWP-WATER UTILITY TOTALS BWP-WATER UTILITY 26...FUND 128 HUD Affordable Housing Programs ...

Last Modified: 09/11/2023

20211202-FY-2021-22-ADOPTED-CIP.pdf

FUND 109 TOTALS FUND 108 TOTALS FUND 107 TOTALS FUND 105 TOTALS FUND 104...FUND 370...

Last Modified: 12/02/2021

10032023-Appendix B_License Plate Study Jan 2022-001 (1).pdf

to 007 NB Total 0 003 SB to 007 NB Total 2 Total 1 Total 0 ...

Last Modified: 04/23/2026

Recirculated DEIR Appendices (LaTerra).pdf

Total U.S....Total U.S....Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total...

Last Modified: 05/04/2021

Recirculated DEIR (LaTerra).pdf

Total U.S....Total U.S....Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total...

Last Modified: 05/04/2021

20201216.AdoptedCIP17_18.pdf

, with capital appropriations totaling $64,438,776 for FY 2017-18....WASTEWATER TOTALS BWP - ELECTRIC BWP - Communications BWP - COMMUNICATIONS...

Last Modified: 12/16/2020

10032023-Appendix B_License Plate Study Jan 2022-001.pdf

005 WB to 002 NB Total 0 Total 1 Total 0 Total 4 Total 1...

Last Modified: 10/03/2023

City of Burbank Single Audit FY 23-24.pdf

Continuum of Care 380,014 63,729 Total Department...SLFRF Program 21.027 4,260,909 - ...

Last Modified: 04/08/2025

FY 2024-25 Adopted CIP_Final

UTILITY (Continued) CIP TOTALS BWP-STREET LIGHTING TOTALS BWP-WATER UTILITY...BWP-WATER UTILITY TOTALS BWP...

Last Modified: 09/05/2024

ApxD_EnergyCalculations.pdf

Consumption Vendor Trucks 13,827 Total...Gallons Diesel 175,411 ...

Last Modified: 07/09/2021

2022 WMP Residential Construction.pdf

Total Pounds: Sum of Pounds Generated: Total Tonage of Debris Generated: (#2 divided...Column A – Total tons of scrap or...

Last Modified: 06/06/2023

Burbank 25-26 CIP PDF Final

NON BWP TOTAL BWP TOTAL BWP Water Utility Total BWP Water Utility BWP Street...Lighting Total ...

Last Modified: 09/11/2025

20210830-2020DIF-Review-002.pdf

Identification of each public improvement for which fees were spent, the total public...- Traffic Signal Upgrade 70023--0537 Capital Contribution Total.iJ�. ii'·• ...

Last Modified: 08/30/2021

20220227-AFR-Year-Ending-June-30-22.pdf

fund balance to total fund expenditures....Total fund balance represents 7,581% of total Low/Mod Fund expenditures of...

Last Modified: 02/27/2023

ACFR 2022-2023

fund balance to the total fund expenditures....The total fund balance represents 6,050% of total Low/Mod Fund expenditures...

Last Modified: 02/08/2024

20210301_AppendixDEnergyCalculation_Avion.pdf

Summary Heavy-Duty Construction Equipment 485,226 Total...Gallons Diesel 139,817 ...

Last Modified: 03/31/2021

2022 WMP Commercial Construction.pdf

Total Pounds: Sum of Pounds Generated: Total Tonage of Debris Generated: (#2 divided...Column A – Total tons of scrap or...

Last Modified: 06/06/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet