Showing results for "dWA 0852 2611 9277 [[Glorion Interior]] Jasa Interior Ruang Tamu Dua Pintu Di Senen Jakarta Pusat"
The Project site is an interior lot currently situated northeast of Paseo Redondo...Length of walls are to include interior and exterior walls,...
Last Modified: 07/12/2024
An investigation is underway after a pedestrian was fatally struck by a train. Burbank, California – An investigation is underway after a pedestrian was fatally struck by a train. On...
Last Modified: 10/22/2025
ALL CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE TESTING AND PRODUCT...ALL CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET...
Last Modified: 08/07/2023
Demolition of interior walls, as long as exterior walls are maintained, does not...Applicant shall calculate the linear length of all exterior and...
Last Modified: 01/27/2022
1521 East Alameda Avenue, for two (2) retaining walls higher than 4 ft along the interior...Fence Exception Permit for two (2) retaining walls higher than 4 ft along the...
Last Modified: 10/16/2025
CONVERT TUN TO SHOWER - SAME LOCATIONHOT MOP AND INTERIOR LATH....Tenant Improvement 04/02/2026Permit Final Final Date:Permit Status: 760 sf of...
Last Modified: 05/28/2026
Burbank Municipal Code (BMC) Section 10-1-603(A), the required side-yard setback for interior...Interior finish material of 5/8” Type ‘X’ gypsum...
Last Modified: 09/03/2025
CONSTRUCTION OF NEW INTERIOR NON-LOAD BEARING PARTITIONS, MILLWORK, FIXTURES, &...Scope of work to include new interior remodel with new...
Last Modified: 06/05/2025
the reconstruction of a portion of the existing retaining wall located in the interior...the reconstruction of a portion of the existing retaining wall located in the...
Last Modified: 03/02/2022
INTERIOR WALL; 3. INTERIOR PLASTER FINISH ; D * 1 2 3 1....STUD WALL (N) INTERIOR WALL (NON BERING) 2. 2x4"...
Last Modified: 07/29/2022
A RESOLUTION OF THE COUNCIL OF THE CITY OF BURBANK TO DESIGNATE THE HOUSE, INTERIOR...Ford Street, to designate the exterior, the garage exterior, and portions of the...
Last Modified: 08/28/2025
AREA: COVERED AREA: LOT COVERAGE: FLOOR AREA RATIO (FAR): SETBACKS: FRONT REAR INTERIOR...M OU NI B & SA LA M D AK HI LL BU IL DI NG ...
Last Modified: 07/14/2023
CONSTRUCT NEW NON-LOAD BEARING INTERIOR PARTITIONS, MILLWORK, FINISHES, & FIXTURES...Commercial Tenant Improvement 06/09/2025Permit Final Final Date:Permit Status: ...
Last Modified: 07/01/2025
Complete interior floor plan of all structures, with each room labeled and dimensioned...Include dimensions and square-footage for the interior...
Last Modified: 03/29/2021
Last Modified: 01/26/2022
Applicant shall calculate the linear length of all exterior and interior walls....The Director also may reduce the interior side setback adjacent...
PROPOSED REAR SET BACK = 28'-0" REQUIRED REAR SET BACK = 15'-0" REQUIRED INTERIOR...SIDE SET BACK = (10%)LOT WIDTH = 9'-10" PROPOSED...
Last Modified: 11/08/2023
He died in 2003. 2311 N....to the interior of the building....He died in 2003. *B6.
Last Modified: 07/09/2021
Showing 121 to 140 of 1,363 entries.