Search Results

Showing results for "dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar"

No results were found that matched the keywords: dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar.
Search Results

Updating GGRP Project

Last Modified: 10/01/2026

Accessory Dwelling Units

420 S Sunset Canyon Dr_HDP-Decision Letter

WATER AND POWER - ELECTRIC 30....AND CONNECTED TO AN APPROVED WATER SUPPLY (R306.4)....HEATER MUST BE STRAPPED TO WALL.

Last Modified: 08/03/2026

Outdoor Irrigation Schedule Returns to Two Days Per Week as of April 1st

This seasonal change is in accordance with the Stage III of the Sustainable Water...Hand watering is allowed any day of the week, before 9AM or...

Last Modified: 03/25/2025

FY 2024-25 Adopted Budget_Final

Accounting Management System/Study 37,967 221,250 259,217 Citywide Solar...Launch instant online solar permits....Energy collected...

Last Modified: 09/05/2024

BWP Issued Warning: Individuals Falsely Claiming to Work for BWP

been reports of companies visiting Burbank homes, claiming to work with Burbank Water...and Power (BWP), and asking to enter the home to perform...

Last Modified: 05/03/2023

2022 Comm-Mixed Correction List

☐ BWP/ Water Division 164 W....Solar Reflectance, Thermal, & Solar Reflective Index Alternative ...

Last Modified: 02/09/2026

2021 N Parish Place - Final Plans

WATER HEATER MUST BE STRAPPED TO WALL (SEC. 507.3, LAPC) AutoCAD SHX Text N....WATER SUPPLY TO FIXTURES: PLUMBING...

Last Modified: 08/22/2025

2026 JUL FINALED

DEFERRED SUBMITTAL-INSTALLATION OF ALUMINUM PARKING LOUVERS $100,000.00Valuation: Solar...2026Permit Final Final Date:Permit Status: NEW, 1000 SF, 1-STORY, DETACHED ADU:...

Last Modified: 08/10/2026

202101_Planning_2311 N. Hollywood Wat - DR Online Community Mtg Agenda.pdf

Hollywood Way Applicant: Richard Solares on behalf of NHW Investors Project Planner

Last Modified: 06/10/2021

2026 MAR FINALED

DOOR WITH 2 FIXED WINDOWS IN LIVING ROOM AND NEW WINDOWS IN BEDROOM; NEW TANKLESS WATER...HEATER

Last Modified: 04/03/2026

Attachment 8 - Cost Recovery Policy.pdf

Cost Recovery Pricing Strategy Community Development Department Water...Heater Installation Permits Important Individual 30.0%...

Last Modified: 05/26/2022

20260422-DIFA8-002.pdf

Strategy Classification Level Cost Recovery Community Development Department Water...Heater Installation Permits Important Individual 30.0%...

Last Modified: 04/23/2026

20210107-2010B-Series-Electric-Revenue-Bonds.pdf

Solar Power....2006, the Governor signed into law Senate Bill 1 (also known as the “California Solar...The community garden will include...

Last Modified: 01/07/2021

3252 N Frederic St 1-29-22.pdf

SHINGLE ROOF TO REPLACE EXISTING 46 ' - 2 " 5' - 1 0" 8' - 2 " (N) SOLAR...STORM WATER MANAGEMENT: ...

Last Modified: 02/08/2022

Burbank2035_Updated (002)

Solar radiation enters the earth’s atmosphere, where a portion is absorbed by the...Most incoming solar radiation passes through GHGs; however,...

Last Modified: 03/24/2026

420 S. Sunset Cny - Project Plans - STAMPED.pdf

WATER GARDEN (121 S.F.)...HEATER WATER FILTRATION POWDER TV S C R EE N SHELVING 6 7 E E E E ...

Last Modified: 11/20/2023

20201221-AFR-Year-Ending-June-30-18.pdf

Copper Mountain 3 Solar Project is located near Boulder City, Nevada, approximately...The facility is the third phase of one of the largest photovoltaic...

Last Modified: 04/12/2021

The Burbank2035 General Plan

Solar  radiation  enters  the  earth’s  atmosphere,  where  a  portion  is  absorbed...Most  incoming  solar ...

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

Solar  radiation  enters  the  earth’s  atmosphere,  where  a  portion  is  absorbed...Most  incoming  solar ...

Last Modified: 11/17/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet