Search Results

Showing results for "dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo"

No results were found that matched the keywords: dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo.
Search Results

20210101_4210_National_ProjectPlans.pdf

LEVERS AND LOCK SETS (ALL HARDWARE) SHALL BE IN ACCORDANCE TO THE TITLE 24 OF THE...LIGHTING IN KITCHENS....KITCHEN...

Last Modified: 04/13/2021

420 S. Sunset Cny - Project Plans - 4-19-23.pdf

BINS A/C D O W N T O B AS EM EN T OPEN RISER STAIR PROPOSED FIRST FLOOR KITCHEN...PLATE LINE 9' -1 " SECTION "C" 8'-3" THEATER ROOM GAME ROOM FAMILY ROOM...

Last Modified: 10/23/2023

Attachment 1 - Resolution with Exhibits A-F -FINAL..pdf

KITCHEN/LIVING KITCHEN BEDROOM 2 PRIMARY BATH 42'-9" (M AXIM UM ) FAU FAU Architecture...KITCHEN/DINING 18'-3" x...

Last Modified: 12/26/2023

1821 N Bel Aire Dr_Planning Approved Plans

IN KITCHENS, BREAKFAST ROOMS, PANTRIES AND DINING ROOMS A MINIMUM OF 2-20A CICUITS...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET...

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

IN KITCHENS, BREAKFAST ROOMS, PANTRIES AND DINING ROOMS A MINIMUM OF 2-20A CICUITS...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET...

Last Modified: 05/06/2026

2026 FEB FINALED

REPLACE (23) ELECTRICAL OUTLETS, (5) ELECTRICAL FIXTURES, (1) KITCHEN HOOD, (1)...Interior remodel of dwelling (great room, laundry, kitchen,...

Last Modified: 03/03/2026

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

existing living room, (3) a 35 square foot new addition to extend existing dining and kitchen...officers, employees agencies, boards, commissions, or City Council to ...

Last Modified: 03/27/2025

2019 W Magnolia - Plans

LEGEND & SYMBOLS LIST E1.2 ELECTRICAL DETAIL E1.3 ELECTRICAL SCHEDULES E1.4 KITCHEN...C18640A-GRC CW 1/2" INDIRECT 1/2" GLASS RINSER REQUIRES IN-LINE WATER REGULATOR...

Last Modified: 03/25/2026

202101_Plans_ 4210 National 4-2-2021 (combined).pdf

LIGHTING IN KITCHENS....KITCHEN LIGHTING INCLUDES ALL PERMANENTLY INSTALLED LIGHTING IN THE KITCHEN...LEVERS AND LOCK...

Last Modified: 06/07/2021

2025 APR FINALED

& BATHROOM, REMOVE A NON-LOAD BEARING WALL IN KITCHEN, REPLACE WATER HEATER AND...TO INCLUDE: (1) KITCHEN HOOD, (12) ELECTRICAL OUTLETS, (7)...

Last Modified: 05/01/2025

3411 Viewcrest Dr - Final Plans.pdf

THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...A PERMANENT MONUMENT SHALL BE RESET, OR A WITNESS MONUMENT OR MONUMENTS...

Last Modified: 06/15/2023

3252 N Frederic St - Approved Plans.pdf

SCOPE OF WORK - (N) 6' TALL FRONT GATE SET BACK 28'. - (N) RETAINING WALL FOR POOL...58 SF HALLWAY 280 SF LIVING ROOM (E) FIREPLACE TO BE DEMOLISHED 155 SF ...

Last Modified: 04/05/2022

2025 MAR FINALED

INTERIOR REMODEL; LIVING ROOM, BATHROOM, KITCHEN, LAUNDRY, CONVERT FAMILY ROOM INTO...REMODEL KITCHEN; 2. REMOVE KITCHEN...

Last Modified: 04/04/2025

20210101_608_N_Bel_Aire_ProjectPlans.pdf

REQ'D SETBACK FOR PROPERTY: 35.5' PROPOSED SET BACK : 35'-10" >35'-6" OK (N...-KITCHEN FAN TO BE 100 CFM ,3 SONE MAX...."X 70 " (E ) W IN...

Last Modified: 04/13/2021

Attachment 5 - Project Plans.pdf

PRIVATE OPEN SPACE PER UNIT: (NOT REQ'D IN MDC-2 ZONE) LANDSCAPING (INCLUDES SET...REVIEW SWITCH LOCATION WITH ARCHITECT PRIOR TO WIRING OR...

Last Modified: 02/12/2024

2026 MAY FINALED

REMODEL (E) KITCHEN & LAUNDRY (141 SF)....INTERIOR REMODEL: REMOVAL OF (E) INTERIOR WALLS AT KITCHEN AND LIVING...

Last Modified: 06/15/2026

2025 JUL FINALED

) ELECTRICAL OUTLETS, (3) ELECTRICAL FIXTURES, (4) PLUMBING FIXTURES, AND (1) KITCHEN...PROPOSED NEW KITCHEN....EXISTING...

Last Modified: 08/11/2025

2026 JAN FINALED

REMODEL FRONT PORCH, 1ST REMODEL: KITCHEN, FAMILY ROOM 724 SF, ROOF ALTERATION....REMODELED KITCHEN, (E) BATHROOM, LIVING ROOM, & OFFICE NOT...

Last Modified: 02/06/2026

2026 SEPT FINALED

and Alteration 09/25/2026Permit Final Final Date:Permit Status: NONSTRUCTURAL KITCHEN...Addition / Alteration 09/30/2026Permit Final Final Date:Permit Status: REMODEL...

Last Modified: 10/01/2026

Att2 - Summary of Proposed Changes

Commercial kitchens are high-volume water users....Single- pass cooling systems have historically been used in commercial settings...is to...

Last Modified: 06/18/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet