Search Results

Showing results for "dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo"

No results were found that matched the keywords: dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo.
Search Results

20260422-2025 DIF Report for Website-001.pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....The kitchen requires commercial- level quality and equipment to...

Last Modified: 04/22/2026

201 E Magnolia Blvd_Plans

Burbank, CA 91502 TENANT IMPROVEMENT PROGRESS SET 01/25/19 ISSUE FOR PLAN CHECK...ROOM 108 A/V 109 STORAGE 115A KITCHEN 107 REDEMPTION STORE...

Last Modified: 03/28/2024

3252 N Frederic St 1-29-22.pdf

SCOPE OF WORK - (N) 6' TALL FRONT GATE SET BACK 28'. - (N) RETAINING WALL FOR POOL...58 SF HALLWAY 280 SF LIVING ROOM (E) FIREPLACE TO BE DEMOLISHED 155 SF ...

Last Modified: 02/08/2022

2026 AUG FINALED

RELOCATION OF AN INTERIOR, NONLOAD BEARING WALL, AND REARANGEMENT OF THE KITCHEN...New kitchen island. New bathroom vanities. -- SUBJECT TO FIELD...

Last Modified: 09/01/2026

2025 NOV FINALED

and Alteration 11/21/2025Permit Final Final Date:Permit Status: NON-STRUCTURAL KITCHEN...INTERIOR REMODEL 382 SF; BATHROOMS #2 & #3, KITCHEN,...

Last Modified: 12/01/2025

Burbank_Recycle-Center-Newsletter_Fall-Winter-2024

When the oil eventu- ally needs to be disposed of, avoid pouring it down the kitchen...Set the bare tree at the curb or next to the dumpsters in...

Last Modified: 06/17/2026

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...PART OF A POOL WATER CIRCULATION CONTROL SYSTEM THAT WILL ALLOW ALL PUMPS TO BE...

Last Modified: 04/12/2024

2026 JUN FINALED

2026Permit Final Final Date:Permit Status: TI - Architectural - Fire Department kitchen...Kitchen remodel, close/replace windows within existing...

Last Modified: 07/01/2026

1727 Rudell Road - View Study Final

The project proposes construction of a new, outdoor kitchen area located along the...An encroachment into the required front yard setback area for the outdoor...

Last Modified: 08/13/2026

SSMP-Update-July14202.pdf

page reminders of proper ways to dispose of grease and oil in and around the kitchen...The design, construction, installation and testing of commercial...

Last Modified: 04/13/2021

2021_Planning_240 North Glenoaks Blvd - Plans.pdf

INTERIOR SEATS 14 KITCHEN 490 SQ. FT....KITCHEN / 200 = 2 OCCUPANT LOAD 391 SQ. FT....INTERIOR SEATS 14 KITCHEN 490 SQ....

Last Modified: 08/26/2021

Con Plan -IDIS FINAL (1).pdf

Provide a brief summary of the data set....What was the purpose for developing this data set?...Provide a brief summary of the data...

Last Modified: 04/15/2026

Con Plan -IDIS FINAL.pdf

Provide a brief summary of the data set....What was the purpose for developing this data set?...Provide a brief summary of the data...

Last Modified: 09/15/2025

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

set by KPicha KPicha Sticky Note None set by KPicha KPicha Sticky Note None set..." Pla n 1 X 23 '-6 " Pla n 1 47...

Last Modified: 12/26/2023

20260422-2025 DIF Report for Website-001 (1).pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....The kitchen requires commercial- level quality and equipment to...

Last Modified: 04/22/2026

PROPOSED FY 2025-26 FEE SCHEDULE

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 08/07/2025

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 12/12/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 09/05/2025

20250625 (3).fy25_26feescheduleadopted.pdf

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 12/18/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet