Search Results

Showing results for "dWA 0859 3970 0884 Fee Pembuatan Interior Rumah Mungil Ala Korea Jebres Solo"

No results were found that matched the keywords: dWA 0859 3970 0884 Fee Pembuatan Interior Rumah Mungil Ala Korea Jebres Solo.
Search Results

2022 Comm-Mixed Correction List

Permit Plan Check Application will expire 180 days after the date of plan check fee...Where circulation paths are interior, required accessible...

Last Modified: 02/09/2026

20260423-DIFSRSR-001

0002020) and Adoption of a Resolution Amending Fiscal Year 2022-2023 Citywide Fee...SCHEDULE TO UPDATE DEVELOPMENT IMPACT FEES (ATTACHMENT...

Last Modified: 04/23/2026

UST with HM Removal Application

This fee shall be for a minimum of four hours based on the above rate....Begin water blasting the tank interior using a minimum of 2,000 PSI of...

Last Modified: 10/06/2025

3313 Wedgewood Ln - Decision Letter - Signed.pdf

decision must be submitted to the Planning Division with the applicable filing fee...more than two stories in height; • Non-structural or non-seismic storefronts,...

Last Modified: 08/24/2023

2025 NOV ISSUED

CONSTRUCTION OF NEW NON-LOAD BEARING INTERIOR PARTITIONS, MILLWORK, FINISHES, &...SYMBIUM-project_1fc4c353-d3e9-47bf-afbb-718296098405 ALA INC ...

Last Modified: 12/01/2025

SR - Art in Public Places ZTA - 01.23.2024.pdf

Access to these interior areas of the Airport is restricted per FAA regulations...Proposed Zone Text Amendment To allow public art located in post-security...

Last Modified: 01/11/2024

Attachment 6 - Culver City Firearms and Ammunition Retail Establishments.pdf

11.19.020 Regulatory permit—application 11.19.025 Regulatory permit—application fee...No. 2022-010 § 1 (part)) § 11.19.025 REGULATORY PERMIT—APPLICATION...

Last Modified: 05/25/2023

HistoricPreservationPlan.pdf

these expenses may be recoverable within the permit processing and development fee...A small attendance fee might be used to enhance the...

Last Modified: 02/02/2021

Sup Final WC Injury Guide Packet 6.3.24

enviarle notificaciones electrónicamente, y usted acepta recibir estas notificaciones solo...by email only.  Marque si usted acepta recibir notificaciones sobre su...

Last Modified: 06/13/2024

City of Burbank Economic Recovery Plan.pdf

The one or two month extension will allow receipt of fees to be within the same...Disinfected fixed-route vehicles daily and wiped down interiors...

Last Modified: 03/29/2021

2020-burbank-economic-recovery-plan-001.pdf

The one or two month extension will allow receipt of fees to be within the same...Disinfected fixed-route vehicles daily and wiped down interiors...

Last Modified: 03/29/2021

Attachment B - Combined City Department Comments

These fees are authorized by the City of Burbank fee schedule under Article III...These Fees are authorized by the City ...

Last Modified: 08/20/2024

The Greenhouse Arts & Media - Proposal for Sublease of Burbank Center Stage (2).pdf

upkeep, as well as general cleaning and maintenance in the facilities of such interior...to the provisions of this section, to make such repairs and improvements to the ...

Last Modified: 09/20/2023

Attachment 6 - August 28, 2023, Planning Commission Staff Report without Attachments.pdf

must include a separate entrance from the main entrance to the structure, with interior...portion of a structure, including the area above a staircase, over 12 feet in ...

Last Modified: 10/05/2023

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

decision must be submitted to the Planning Division with the applicable filing fee...Length of walls are to include interior and exterior walls,...

Last Modified: 03/27/2025

Adoption of Resolutions Adopting the Fiscal Year 2025-26 Annual Budget, Citywide Fee

Adoption of Resolutions Adopting the Fiscal Year 2025-26 Annual Budget, Citywide Fee

Last Modified: 06/02/2025

2025 SEPT FINALED

Final Date:Permit Status: Multi-Family Addition and Alteration Unit Type 3.1 - Interior...TI: DEMO ALL INTERIOR FINISHES, WALLS, AND NON COMPLIANT...

Last Modified: 10/06/2025

Adoption of Resolutions Adopting the Fiscal Year 2023-24 Annual Budget, Citywide Fee

Adoption of Resolutions Adopting the Fiscal Year 2023-24 Annual Budget, Citywide Fee

Last Modified: 06/02/2023

3425 Brace Canyon - Decision Letter.pdf

Length of walls are to include interior and exterior walls, including openings, and...more than two stories in height; • Non-structural or non-seismic storefronts,...

Last Modified: 04/22/2022

Adoption of Resolutions Adopting the Fiscal Year 2024-25 Annual Budget, Citywide Fee

Adoption of Resolutions Adopting the Fiscal Year 2024-25 Annual Budget, Citywide Fee

Last Modified: 05/28/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet