Search Results

Showing results for "dWA 0859 3970 0884 Harga Kitchen Set Minimalis Bentuk L Modern Purwosari Gunungkidul"

No results were found that matched the keywords: dWA 0859 3970 0884 Harga Kitchen Set Minimalis Bentuk L Modern Purwosari Gunungkidul.
Search Results

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

Without Kitchen $69.00 1-3 Hours With Kitchen $16.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 03/18/2026

20210101_2814_W_Empire_Ave_NOI_Final.pdf

LIVINGBEDROOM BATH KITCHEN 2 4 '- 3 " 19'-6" LIVING BEDROOMBEDROOM BATH BATH...KITCHEN 2 4 '- 3 " '29 -0" BATH BATH ...

Last Modified: 08/30/2021

Downtown Burbank Metrolink Station Elevator Waterproofing and Modernization Project

Station and the Olive Avenue bridge will be closed as the structure and elevator are modernized...Station and the Olive Avenue bridge will be closed as the structure and...

Last Modified: 07/23/2024

420 S. Sunset Cny - Project Plans - STAMPED.pdf

BINS A/C D O W N T O B AS EM EN T OPEN RISER STAIR PROPOSED FIRST FLOOR KITCHEN...PLATE LINE 9' -1 " SECTION "C" 8'-3" THEATER ROOM GAME ROOM FAMILY ROOM...

Last Modified: 11/20/2023

20201210.AdoptedCIP20_21.pdf

include offices, recreation classrooms, storage rooms, gymnasium, restrooms, a kitchen...R E F U S E C O L L E C T...

Last Modified: 12/10/2020

20210401_3700RD_Appendix_B.pdf

Regulatory Setting Cultural Resources Assessment 7 2 Regulatory Setting...Gibson, Mark L....Architectural Style: ...

Last Modified: 04/12/2021

250220_City of Burbank - Home Again Los Angeles

THE LOW VOLTAGE SYSTEMS PLAN WILL NEED TO INCLUDE MODERN SYSTEMS DESIGN; HOT SPOTS...0" 5 KITCHEN ELEV. - B 1/2" = 1'-0" 4...

Last Modified: 02/25/2025

3130 N Lamer St Arch plans.pdf

BUILDING HEIGHT = 13'-0" (to Top of Plate) 20' 19 ' (E) 2-CAR GARAGE KITCHEN...1 L 2 L 3 ...

Last Modified: 09/01/2023

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 09/20/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 10/05/2023

20230731-FY-23-24-Fee-Schedule-Final

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Without Kitchen $65.00 1-3 Hours With Kitchen $15.00 Each Addl. Hr....With Kitchen (6) Non-Profit - Non-Resident...

Last Modified: 09/01/2023

Exhibit B - 3130 N Lamer St - Approved Plans.pdf

BUILDING SET BACKS: EXISTING FRONT SET BACK = 25'-0" ALLOWABLE MAX....= 15'-0" PROPOSED REAR SET BACK = 28'-0" ...

Last Modified: 11/08/2023

Sample Plan Dec 2024

2.5 Hose Bibb, each additional 4 1 1 Lawn Sprinkler each head 2 1 1 Sinks Kitchen...Hose Bibb: 1 Hose Bibb each additional 4: Lawn Sprinkler each head 2: Sinks...

Last Modified: 12/10/2024

Appendix D - Historic Resource Assessment.pdf

J D Sterling Construction (C) $97,000.00 Kitchen remodel in all six units, new...Company (C) — Permit for six water closets, six lavatories, six bathtubs, six ...

Last Modified: 01/07/2025

20251126-24-25_DIF_Annual_Report-001.pdf

Modern FAC FY 2025- 2026 Yes - planning and design phases were longer than...The kitchen needs to be upgraded to meet ADA compliance...

Last Modified: 11/26/2025

20260422-2025 DIF Report for Website-001.pdf

Modern FAC FY 2025- 2026 Yes - planning and design phases were longer than...The kitchen needs to be upgraded to meet ADA compliance...

Last Modified: 04/22/2026

3307 CASTLEMAN LN - Project Plans.pdf

= 80.27' CASTLEMAN LANE 2 8 ' LOT 10 SET REBAR & CAP, "L.S. 8571" AT...SET REBAR & CAP, "L.S. 8571" 2.00' O/S N'LY FROM PROP....

Last Modified: 07/14/2023

20230911-Budget-at-a-Glance-Adopted-FY-2023-24.pdf

The Burbank City Charter sets forth the legal re- quirements for the adoption of...• $10.7 Million - Park facility improvements, including ballfield lighting...

Last Modified: 09/11/2023

20230912-FY-23-24-Budget-at-a-Glance-v2

The Burbank City Charter sets forth the legal re- quirements for the adoption of...• $10.7 Million - Park facility improvements, including ballfield lighting...

Last Modified: 09/12/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet