Showing results for "dWA 0859 3970 0884 Kontraktor Interior Rumah Mewah Klasik Modern WIlayah Jatisrono Wonogiri"
WPB WV BFV DI EPB FF HCR WM EXISTING CONCRETE PAVEMENT APN EXISTING INTERIOR...ALL PIPE MEASUREMENTS ARE INTERIOR DIAMETERS....ALL PIPE...
Last Modified: 03/18/2025
The interior materials included all interior partitions, remaining furniture, test...Additional suspected ACM identified within the...
Last Modified: 03/31/2021
. 2 Consideration will be given to Proposers that can financially support modernizing...b) Ensure daily trash removal from all interior areas...
Last Modified: 09/22/2023
The deviations from the minimum and average setbacks on the interior side, rear...Rear minimum -5 feet Rear average – 7 feet Interior side...
Last Modified: 09/10/2025
Last Modified: 02/25/2026
side yard, but may be (H) LOCATION AND SCREENING OF permitted within the required interior...not occupy more than one-third (1/3) the area of the roof, are located in...
Last Modified: 03/19/2024
First Floor Minimum Setbacks (Street-facing side, Interior side and Rear Property...Interior side and rear yards setback areas may be utilized...
Last Modified: 01/19/2024
Each (13) Manufactured House $162.25 Each Unit (14) Partition (a) Commercial, Interior...of Occupancy/Condo Conversion $80.80 Each Unit (5) Close Existing Openings (a)...
Last Modified: 06/20/2022
Each (13) Manufactured House $155.05 Each Unit (14) Partition (a) Commercial, Interior...to 30 lf (ii) Additional partition, up to 30 lf $15.65 Each (b) Residential,...
Last Modified: 03/09/2023
AREA: COVERED AREA: LOT COVERAGE: FLOOR AREA RATIO (FAR): SETBACKS: FRONT REAR INTERIOR
Last Modified: 07/14/2023
INTERIOR SIDE YARD SETBACK: 5' MIN. 5' MIN.
Last Modified: 11/23/2021
$20,984,402 Recreation Centers (MCC, ORC, VRC) Renovation $52,461,005 Joslyn Adult Center Modernization...$52,461,005 $52,461,005.20 City Staff DIF and Other Sources Joslyn...
Last Modified: 05/26/2022
in the process of growth and initiate programs not currently available to meet modern...projects I'd advocate for would be ensuring that all bus stops in the city meet...
Last Modified: 06/15/2023
Renovation Recreation Centers (MCC, ORC, VRC) Renovation Joslyn Adult Center Modernization...$52,461,005 $52,461,005.20 City Staff DIF and Other Sources Joslyn Adult...
Last Modified: 04/23/2026
HDWD HDWR HORIZ HR HT HVAC HW INSIDE DIAMETER INCLUDE, INCLUDING INSULTATION INTERIOR...LINES LINE TYPESCEILING/EQUIPMENT HEIGHTS DIMENSION STRINGSINTERIOR...
Last Modified: 10/13/2022
upkeep, as well as general cleaning and maintenance in the facilities of such interior...to the provisions of this section, to make such repairs and improvements to the ...
Last Modified: 09/20/2023
more than two stories in height; • Non-structural or non-seismic storefronts, interior...required front or street side yard, but may be permitted within the required...
Last Modified: 01/17/2023
Last Modified: 06/26/2023
Showing 641 to 660 of 907 entries.