Search Results

Showing results for "SB 9 Urban Lot Split Eligibility Application"

No results were found that matched the keywords: SB 9 Urban Lot Split Eligibility Application.
Search Results

Final - 2500 NHW PD-DA-EIR_Notice_Mailer.docx

parking spaces in the parking garage and 285 parking spaces in a surface parking lot...The Draft EIR was circulated for the required 45 days; 9...

Last Modified: 09/22/2026

50c. 2021 Water bonds OS.pdf

in part on any date (by such maturities as may be specified by the City and by lot...Wildland and wildland/urban interface fires are relatively...

Last Modified: 03/20/2024

03202024-2021 Water bonds OS.pdf

in part on any date (by such maturities as may be specified by the City and by lot...Wildland and wildland/urban interface fires are relatively...

Last Modified: 03/20/2024

FY 2026-27 Adopted CIP Book FINAL

150,000 Totals $150,000 - - - - - - $150,000 Project Description This project is to split...Staff will hire a consultant to design the layout, build a drywall...

Last Modified: 09/10/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet